GTR 119138646
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Flood Protection Herzberg Se3p, Sub-Object 1, Construction Phases 1 To 3 Right (Ba1-3Re), Environmental Construction Support
ICB — International Competitive Bid
Closes Nov 11, 2026
Western Europe
Tender Information
GTR Reference
119138646
Tendering Authority
Subscribe to view
Tender No
699466-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Flood Protection Herzberg Se3p, Sub-Object 1, Construction Phases 1 To 3 Right (Ba1-3Re), Environmental Construction Support
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
11-11-2026
Work Detail
Architectural, Construction, Engineering And Inspection Services – Flood Protection Herzberg Se3p, Sub-Object 1, Construction Phases 1 To 3 Right (Ba1-3Re), Environmental Construction Support. The General Aim Of Environmental Construction Support (Ubb) Is - To Carry Out Construction In Accordance With Approval And Environmental Law, - To Avoid Liability Damages Under The Environmental Damage Act During Construction - To Avoid Environmental Damage And The Resulting Costs And Time Delays - To Avoid Disruptions In The Construction Process Through Timely Reference To Deadlines, Requirements And Suitable Measures - To Preserve Evidence And Document It. Environmental Construction Support Services Serve To Prevent And Avoid Ecological And Economic Damage As Well As To Support The Client In Environmentally Relevant Issues. The Main Ubb Services For This Project Are: 1. Clarifying The Task 2. Supporting The Construction Work: Participation In Construction Consultations, Monitoring The Protection, Avoidance And Route-Related Compensation Measures, Carrying Out Preparatory Species Protection Measures And Issuing Relevant Construction Permits 3. Services To Prepare For The Acceptance Of The Construction Project, Drawing Up An Overall Balance Sheet The Services Are Described In Appendix 1; They Were Taken From The Hva-F Stb And Adapted. The Adapted Passages Are Shown In Italics. The Accompanying Landscape Conservation Plan Sets Out Protection, Avoidance And Compensatory Measures, The Monitoring Of Which Is To Be Viewed As A Service Provided By Ubb. A List Of Relevant Lbp Measures Can Be Found In Appendix 5. In Addition To General, Non-Quantifiable Tasks In Species, Soil And Water Protection, The Following Specific Measures Must Be Monitored: - Protection Of Trees/Vegetation Or Lrt As Tree And Biotope Protection - Erection And Maintenance Of Amphibian And Reptile Protection Fences - Check For Beaver Population And Ant Nests - Ordering/Sowing With An Indigenous Seed Mixture. Construction Pits Must Be Checked During The Construction Period, As Well As The Sowing And Mowing Of Soil Piles. After Construction Interruptions, Areas Must Be Checked For Breeding/Suspected Breeding And Cleared.
Key Value
Tender Value
73,185 - EUR
Tender Documents
Global Tender Document
fd5f6201-10fd-4bf1-9b71-28743f0d11eb.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.