GTR 118793860
Tenders Are Invited For Reconstruction Of Water Supply Branches In The Town Of Dolni Dabnik - Second Stage, Secondary Water Supply Branches Along Hristo Yanchev Street With Numbers 69, 18, 17, 148, 149 From Ok 103 To Ok 282
ICB — International Competitive Bid
Closes Oct 30, 2026
Eastern Europe
Tender Information
GTR Reference
118793860
Tendering Authority
Subscribe to view
Tender No
01071-2026-0016
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of Water Supply Branches In The Town Of Dolni Dabnik - Second Stage, Secondary Water Supply Branches Along Hristo Yanchev Street With Numbers 69, 18, 17, 148, 149 From Ok 103 To Ok 282
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
30-10-2026
Work Detail
The Water Supply Network Of The City Of Dolni Dabnik Is Built For The Most Part From Eternite And Steel Pipes.The Total Length Of The Water Supply Network As Of 30.12.2019 Is 56,157 M, Of Which:- Internal Network 41,965 M, Made Of Eternite Pipes - 33,135 M, Steel Pipes - 5,929 M, Pevp Pipes - 2,190 M And Galvanized Pipes - 710 M. The Steel Pipes (Mannesmann Muffins) Were Laid In 1929. Construction With Eternite Pipes Was Mainly Carried Out Until 1969. Construction With Pevp Pipes Was Completed After 1999.- External Network 14,192 M, Of Which 7,379 M Of Water Pipe From Eternite Pipes F250 From The Pressure Reservoir To The Regulation, Steel Pipes - 6,583 M And Stone Pipes - 230 M.Current, The Replacement Of Eternite Pipes With Pevp Pipes According To Part Of Ch. Cl. Ii With A Length Of About 1.1 Km. The New Pipes Have A Diameter Of Ф 200.Replaced In 1995 Pusher Through The Settlement, Performing The Functions Of Ch. Cl. I, Is In Good Condition And Works Normally.The Municipality Of Dolni Dabnik Is Taking Significant Steps In The Direction Of Replacing The Main Water Transmission Network.The Working Project Was Prepared On The Basis Of An Update Of An Approved Conceptual Project, In Which The Territory Of The City Is Covered With Three Main Branches Covering The Settlement In A Ring, With The Aim Of Better Distribution Of Supplied Water Quantities To Consumers And, Above All, Maximum Approximation Of The Supplied Gravity Water From The Pressure Tank To The Higher Parts Of The Settlement.In 2024 The Implementation Of The Site: Reconstruction Of Water Supply Branches In The City Of Dolni Dabnik - Stage I, Main Branch I, Main Branch Ii, Main Branch Iii And Pusher, Part 1: Reconstruction Of Main Branch I - Lot 1 /Ok74-Ok125/, Lot 2 /Ok125-Ok398/ And Pusher Of The Water Supply Network Of The City Of Dolni Dabnik, With A Total Length Of 2154M.With The Implementation Of The Current Project Development, The Reconstruction Of The Internal Network Of The City Continues, Affecting Water Pipes Along Hristo Yanchev Street With A Total Length Of 1744M - Branch 69 (With A Length Of 196M), Branch 17 (With A Length Of 350M), Branch 148 (With A Length Of 245M) And Branch 149 (Length With A Length Of 543M) From O.K.103 To O.K.282. In The Rest Of The Water Network, Accidents Are Numerous And Systematic Throughout The Territory, In Some Places Imperceptible Due To The Type Of Soil.
Key Value
Tender Value
908,395 - BGN
Tender Documents
Global Tender Document
a117d860-d068-4bc8-9597-61012035c384.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.