GTR 118742089
Tenders Are Invited For Reconstruction Of The Road Surface. Wspólna In Ścinawa Nyska, Plot No. 346/3
ICB — International Competitive Bid
Closes Oct 14, 2026
central europe
Tender Information
GTR Reference
118742089
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Road Surface. Wspólna In Ścinawa Nyska, Plot No. 346/3
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
14-10-2026
Work Detail
I. Main Subject Object And Scope Of The Orderthe Subject Of The Order Is The Reconstruction Of The Surface Of The Internal Road (Ul. Wspólna) In Ścinawa Nyska (Plot No. 346/3) On A Section With A Length Of 100.20 M And A Variable Road Width From 3.5 M To 5.0 M. The Detailed Scope Of Construction Works Includes In Particular: • Earthworks: Carrying Out Trenching Along With Profiling And Compacting The Subgrade For New Construction Layers On The Total Area Of The Section. • Base: Construction Of A Stabilization Layer With Cement Rm 5.0 Mpa, 15 Cm Thick, And An Upper Base Layer Of Crushed Aggregate 0-31.5 Mm, 25 Cm Thick. • Road Surface: Laying The Surface Of 8 Cm Thick Vibro-Pressed Concrete Cubes In Gray (Total Area Approx. 380 M²) On A 3 Cm Thick Stone Dust Ballast. • Street Elements: Arrangement Of Raised Concrete Curbs (15X22x100) On A Concrete Footing With Resistance, With A Total Length Of Approx. 213 M. • Roadsides And Sidewalks: Construction Of Roadsides Made Of Crushed Aggregate 0/31.5, 0.5 M Wide, And Relocation Of The Existing Sidewalk Surface With Concrete Cubes On An Area Of Approx. 25 M². • Drainage: Surface Drainage Of Rainwater To The Adjacent Road Area And To Existing Stormwater Drainage Elements. • Supplementary Works: Regulation And Adjustment Of Exits To Adjacent Properties, Connection To The Internal Road, And Topsoiling Of The Road Area With Grass (Approx. 100 M²). • Marking: Installation Of Target Road Markings. Ii. Key Implementation Conditions And Formal Requirements• Temporary Traffic Organization (Tor): The Contractor Is Obliged To Develop, Obtain Approval From The Relevant Manager And Implement A Temporary Traffic Organization Project For The Duration Of The Works. • Construction On An Active Facility: The Works Will Be Carried Out On An Active Facility. The Contractor Must Provide Permanent Access And Access To Adjacent Properties. It Is Required To Notify The Owners, Residents And The Investor In Writing About The Dates And Types Of Restrictions On Access To The Property At Least 4 Days In Advance.• Protection Of The Existing Buildings: Due To The Close Location Of The Buildings, The Contractor Is Obliged To Use Technologies That Minimize Nuisance. It Is Required To Prepare A Photographic Inventory Of The Condition Of All Nearby Buildings Before The Commencement Of The Works (Within 7 Days From The Handover Of The Construction Site) And After Their Completion.• Geodetic Services: The Contractor Provides Full Geodetic Services, Including Marking Out The Route, Identification And Protection Of Existing Underground Networks, Points And Boundary Signs, As Well As Preparing An As-Built Geodetic Inventory.• Technical Supervision: It Is Required To Ensure That The Works Are Managed By A Person With Appropriate Professional Qualifications And Construction Licenses In The Road Engineering Specialty.• Task Settlement: Cost Estimate Remuneration Settled On The Basis Of Actually Performed And Accepted Quantities Of Works (As-Bui
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
16810ddc-c68e-4972-aa1a-ebc5e81e2824.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.