GTR 118741022
Tenders Are Invited For Heating, Ventilation And Air-Conditioning Installation Work – New After-School Care Building, St.-Jantzen-Ring 3-6, 18106 Rostock - Lot 402 Heating Systems
ICB — International Competitive Bid
Closes Oct 30, 2026
Western Europe
Tender Information
GTR Reference
118741022
Tendering Authority
Subscribe to view
Tender No
674001-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Heating, Ventilation And Air-Conditioning Installation Work – New After-School Care Building, St.-Jantzen-Ring 3-6, 18106 Rostock - Lot 402 Heating Systems
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
30-10-2026
Work Detail
Heating, Ventilation And Air-Conditioning Installation Work – New After-School Care Building, St.-Jantzen-Ring 3-6, 18106 Rostock - Lot 402 Heating Systems. The Service Includes, Among Other Things: - A Heating System With A Connection To The District Heating Station Of The Municipal Utility, Equipped With Two Heat Exchangers For The Separate Supply Of The Static Heating And The Air Conditioning Systems - The Static Heating Has A Heating Circuit Distributor With Three Outlets: O Outlet 1: Hk1 Underfloor Heating After-School Care/Canteen O Outlet 2: Hk2 Underfloor Heating Kitchen O Outlet 3: Connection To The District Heating Station - All Outlets Of The Heating Circuit Distributor Are Equipped With The Following Fittings And Components Equipped: Shut-Off Valves, Control Valves, Pressure Gauges, Thermometers, High-Efficiency Circulation Pumps And Heat Meters - Starting From The Heating Center, The Distribution Lines Run In The Suspended Ceiling On The Ground Floor To The Respective Consumers And To The Rising Points On The 1St Floor - The Pipe Material Is A Stainless Steel Pipe System With Press Connections Suitable For Heating Installations - All Pipes And Fittings Receive 100% Thermal Insulation In Accordance With The Requirements Of The Geg. - The Hydraulic Balancing Of The Heating System Is Carried Out Via Differential Pressure Regulators, Balancing Valves And Presettings Of The Thermostat Valves - The Building Is Predominantly Heated Via Underfloor Heating In A Wet Screed System. - The Stairwells And Outside Toilets Are Heated Using Radiators - The Individual Heating Circuits Are Controlled Via Room Thermostats That Are Centrally Connected To The Building Automation
Key Value
Tender Value
8,200,000 - EUR
Tender Documents
Global Tender Document
b32359c0-5541-4a11-9abc-159fd0e10307.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.