GTR 118629380
Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works – Planning Services (Lph 5 / Lph 6 And Partial Services Lph 4 And Lph 7) For The New Construction Of A Passenger Overpass Over The 6153 Railway Line At The Hangelsberg Stop
ICB — International Competitive Bid
Closes Oct 19, 2026
— 5 days left
Western Europe
Tender Information
GTR Reference
118629380
Tendering Authority
Subscribe to view
Tender No
649588-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works – Planning Services (Lph 5 / Lph 6 And Partial Services Lph 4 And Lph 7) For The New Construction Of A Passenger Overpass Over The 6153 Railway Line At The Hangelsberg Stop
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
19-10-2026
5 days left
Work Detail
Engineering Design Services For The Construction Of Civil Engineering Works – Planning Services (Lph 5 / Lph 6 And Partial Services Lph 4 And Lph 7) For The New Construction Of A Passenger Overpass Over The 6153 Railway Line At The Hangelsberg Stop. Contents Of The Service: Structure Of This Service Description Part 1 - Object Planning Of Traffic Systems Lp 5 Hoai Object Planning Of Engineering Structures Lp 5 Hoai Structural Planning Of The Engineering Structures Lp 4 And 5 Hoai Including The Special Service: Recording Construction States For Construction Phase-By-Section Construction. Specialist Planning Of Technical Equipment Lp 5 For 50 Hz Power Systems As Well As Earthing Planning - Part 1.1 - Examination Of The Execution Documents By An Eba-Approved Auditor, With Regard To The Service Area Of Structural Engineering (Kib), - Part 2 - Preparation Of The Award (Service Phase 6 Hoai): Preparation Of The List Of Services For The Construction Work Of The Passenger Transfer On The Basis Of The Design Planning As Well As Parts Of The Participation In The Award (Service Phase 7 Hoai) Here However, Only The Services For Answering Bidders Questions And Creating The Price List. A Complete Design Plan (Service Phase 3 Hoai) Is Available For The Project From Db Engineering & Consulting Gmbh, East Region, As Of June 25, 2026, Which Is Part Of The Tender Documents. The Implementation Planning Is Not A New Planning, But Rather The Binding Continuation Of The Existing Draft Planning Until It Is Ready For Execution. The Contractor Must Expressly Update The Draft Planning In All Technical Parts And May Only Deviate From This In Justified Individual Cases Agreed With The Client And Db Infrago Ag. The Design Statics (Appendix 09 Of The Design Planning) Must Also Be Expressly Updated By The Contractor And Supplemented With All The Evidence Required For Execution (Including Detailed Evidence Of The Connections, Assembly Conditions, Fatigue Evidence). Note On Special Services/Recording Of Construction Conditions: In This Highly Statically Indeterminate Construction, In Addition To The Basic Services Of The Hoai, The Recording Of Construction Conditions For Construction Phase-By-Section Must Also Be Taken Into Account. Due To The Construction Conditions, Structural Adjustments May Still Be Necessary. The Basic Appearance Of The Bridge Should Not Be Changed If Possible. The Construction Statuses Shown In The Draft Planning, In Particular Plan 08_07_Ep_Bhgb_Pü_00_Bzp - Construction Status Plan, As Well As The Information In The Explanatory Report On Assembly With A Mobile Crane In The Track Area And Sectional Ramp Assembly With A Road-Rail Vehicle/Crane, As Well As The Piping Of The Trebuser Graben For The Construction Of The Construction Roads, Must Be Expressly Incorporated Into The Implementation Planning And Further Developed There Until It Is Ready For Execution. Deviations From The Construction States Specified In The Draft Planning Are Only Permitted If They Result From The Readiness For Execution And In Any Case Require The Prior Consent Of The Client And Db Infrago Ag Completion Of The Implementation Planning And Submission For Examination (All Three Specialist Parts) 02/26/2027 Part 1.1 - Examination Of The Implementation Documents By The Eba-Approved Auditor (Kib) By E.G
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5305d66c-a818-42a2-96cc-50d5c3642ee4.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.