GTR 118496407
Tenders Are Invited For Construction Of Street Lighting At Ul. Kosciuszko (Us)
ICB — International Competitive Bid
Closes Oct 08, 2026
central europe
Tender Information
GTR Reference
118496407
Tendering Authority
Subscribe to view
Tender No
ZP.271.1.56.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of Street Lighting At Ul. Kosciuszko (Us)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
08-10-2026
Work Detail
1. The Task Includes The Construction Of Lighting For The Connector Of The Municipal Road Ul. Kościuszki With The Road Of 11-Go Listopada (Division 1509/1, 2337/2), Which Includes The Construction Of A Yakxs 4X35 Mm2 Cable Line With A Lighting Network Length Of Approx. 260 M With Fezn 4*25 Mm Tape, Installation Of 6 Aluminum Lighting Poles, In A Color Similar To Ral 9011, Including 3 Pcs. 8 M High (Poles No. 4, 5, 6) And 3 Pcs. 10 M High (Poles No. 1, 2, 3), Poles Protected With Polyurethane Elastomer Up To The Height Of The Pole Recess, With Mounted Led Fixtures On Aluminum Booms In The Same Color As The Poles (Ral 9011). 2. Fixtures With Factory-Installed Nema 5/7 Pin Or Zhaga Sockets, Along With Controllers Compatible With The Existing Smart City Street Lighting Control System. Luminaires On Poles No. 4, 5 And 6 And On Pole No. 1 With A Minimum Luminous Flux Of 5426 Lm And On Poles No. 2, 3 And On Pole No. 1 With A Minimum Luminous Flux Of 10836 Lm. The Shape Of The Fixtures Must Be Unified With The Existing Fixtures In The City Of Kolbuszowa, Due To The Aesthetics Of The City. 3. The Construction Of This Network Requires The Use Of Pushes And Drillings, As Well As The Dismantling And Reconstruction Of The Sidewalk Surface (Paving Stones) In The Vicinity Of The Drillings And The Construction Of Poles No. 2 And 3. 4. A Prior Site Visit Is Recommended. Work At Intersections With The Networks Of Other Operators (Energy, Gas) Should Be Carried Out In Consultation With The Network Owners And Acceptance Protocols For The Works To Be Covered Should Be Obtained. Before Starting Work, The Materials To Be Installed Must Be Approved With The Investor.5.After Construction, The Lighting Network Should Be Submitted For Acceptance To Pge Dystrybucja Rejon Energetyczny Mielec And Completed With Positive Acceptance. 6. Additionally, As Part Of The Procedure, A Dynamic Reactive Power Compensator Should Be Delivered And Installed. The Compensator Will Be Mounted On A Rotating Power Pole, Under The Existing Street Lighting Box. 7. The Reactive Power Compensator Must Be Able To Reduce Harmonics Min. Up To The 13Th Harmonic And Load Symmetrization Between Phases, It Must Be In The Cabinet Version With Instrumentation And Protection For External Conditions. It Must Be Selected For The Power Of Existing Led Luminaires With A Power Of 2900 W, With A Margin Of + 25%. The Compensator Should Ensure Reactive Power Compensation So That The Tg Φ Is Within The Range 0 - 0.4 (Ind), When Dimming The Luminaires From 100% To 40%. During The Investment Warranty Period, The Compensator Will Be Maintained And Adjusted By The Contractor So That It Fulfills Its Role. The Compensator Should Be From A Series Of Existing Dynamic Reactive Power Compensators Installed At Street Lighting In Kolbuszowa. The Existing Dynamic Reactive Power Compensators Are From Lopi And Aniro. Compensators Must Be Able To Send Information To The Ordering Party Via The Website Or In The Form Of Text Messages,
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
825caee2-ecfa-442a-8687-bef1b4a9971d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.