GTR 118422810
Request For Quotation Purchase Of Building Materials For The State Research And Production Enterprise Rsu
ICB — International Competitive Bid
Closed
Central Asia
Tender Information
GTR Reference
118422810
Tendering Authority
Subscribe to view
Tender No
17669313
Financer Name
Self-Funded
Work Title
Request For Quotation Purchase Of Building Materials For The State Research And Production Enterprise Rsu
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
24-09-2026
Closed
Work Detail
Coupling Head Gm-50 To Be Agreed With The Customer, Fire Connecting Head Gm-50. Agree With The Customer, Adapter Head Gp 50X70. Agree With The Customer., Diesel Burner (Single Stage), 154–308 Kwcharacteristics And Descriptionmain Featuresfuel Type: Liquidtype Of Liquid Fuel: Dieselburner Operation Type: Fanregulation: Single Stagerated Power: 260 Kwburner Power Range: 154–308 Kwnominal Liquid Fuel Consumption Per Burner: 25.9 Kg/Hexcess Air Ratio: 1.15Weight: 23 Kgdimensionsheight: 350 Mmlength: 610 Mmwidth: 460 Mmpurpose And Featuresthe Burner, Running On Diesel Fuel, Is Designed To Work Together With Hot Water And Steam Boilers.Main Features And Design Characteristics:The Burner Is Designed To Operate On Diesel Fuel.Single-Stage Power Adjustment.Mechanical Atomization Of Fuel Under High Pressure Using A Nozzle.Possibility Of Obtaining Optimal Combustion Parameters By Regulating The Combustion Air And Chimney.Maintenance Is Made Easier By The Ability To Remove The Spray Unit Without Removing The Burner From The Boiler.Air Flow Regulation Is Carried Out Using A Hydraulic Regulator.A Flange And An Insulating Seal Are Provided For Attaching The Burner To The Boiler.The Combustion Air Inlet Is Equipped With An Air Flow Control Device.The Sliding Boiler Connection Flange Allows Adaptation To The Head Projection Of Different Types Of Boilers.The Single-Phase Electric Motor Is Designed To Run The Fan And Fuel Pump.The Presence Of A Flame Is Monitored Using A Photocell (Photoresistor).Electrical Installation Protection Degree: Ip40.Equipmentdiesel Burner - 1 Pc.Nozzle - 1 Pc.Flange For Fastening To The Boiler - 1 Pc.Insulating Seal - 1 Pc.Set Of Fastening Elements - 1 Set.Operating Instructions - 1 Pc. Agree With The Customer.
Key Value
Tender Value
113,000 - KZT
Tender Documents
Global Tender Document
5867270c-ea68-46f5-9375-5f1a2dc05e46.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.