GTR 118292994
Tenders Are Invited For Technical Controller (Ct) Services For Cob De Versailles
ICB — International Competitive Bid
Closes Sep 23, 2026
— 3 days left
Western Europe
Tender Information
GTR Reference
118292994
Tendering Authority
Subscribe to view
Tender No
2026-073
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Technical Controller (Ct) Services For Cob De Versailles
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
23-09-2026
3 days left
Work Detail
The Contract Concerns A Technical Controller (Ct) Mission For The Design And Construction Phases, Relating To The Versailles Bus Operational Center Project. The Establishment Of The Technical Controller Market Meets Regulatory Obligations Under Articles L111-23 To L111-26, And R111-29 To R111-42 Of The Construction And Housing Code. The Holder Must Therefore Ensure Technical And Regulatory Compliance And Validate The Documents Issued For All Of The Design Studies And Execution Of The Following Operations: -Asbestos Removal Of Existing Works, -Soil Decontamination In Line With The Works Created, -Demolition/Deconstruction Of Existing Works, -Construction Of A Maintenance And Storage Site (Bus Depot), -Carrying Out Road Works On The Plot Of The Maintenance And Storage Site, -Redevelopment Of The Intersection Entry To The Site (Rd10). Furthermore, The Incumbents Mission Must Be Carried Out In Close Collaboration With External Stakeholders That The Project Owner Will Retain For The Missions Of: - Topographic Surveys, - Geotechnical Surveys And Asbestos And Pah Research, - Project Management Whose Service Includes Ssi Coordination, - Safety And Health Protection Coordination. The Mission Elements Which Will Be Assigned To The Technical Controller Will Be Defined In Accordance With Articles L. 111-23 To L. 111-26 And R. 111-29 Et Seq. Of The Construction And Housing Code And Decree No. 99-443 Of May 28, 1999 Relating To The Specifications Of General Technical Clauses Applicable To Public Technical Control Contracts. The Missions Will Be Carried Out In Accordance With Standard Nfp 03-100 Of September 1995 And Constitute The Following Elements: -Lp: Relating To The Solidity Of Inseparable And Separable Structures; - L Mission Aimed At Preventing Defects In The Solidity Of Inseparable Structures And Equipment Elements (Solidity Of Viability, Foundation, Backbone, Enclosure And Roofing Works, As Well As On Equipment Elements Which Are Inseparably Part Of The Works), - P1 Mission Relating To The Solidity Of Equipment Not Inseparably Linked, - S Mission Relating To The Safety Of People In Constructions, - F Mission Relating To The Operation Of The Installations, - Av Mission Relating To The Stability Of The Surrounding Area, - Hand Mission Relating To The Accessibility Of Buildings For Disabled People - Ph Mission Relating To The Acoustic Insulation Of Buildings, - Th Mission Relating To Thermal Insulation And Energy Savings, - Gtb Mission Relating To The Technical Management Of The Building, - Env Mission Relating To The Environment, - Hys Mission Relating To Hygiene And Health In Buildings. It Is Also Entrusted To The Technical Inspector, And Depending On The Works, The Following Mission: - Mission Drafting Of The Certificate Of Accessibility For Disabled People Defined By The Decree Of March 22, 2007. - Mission Of Initial Verification Of Electrical Installations Mentioned In Article R422614 Of The Labor Code. In The Asbestos Removal Phase (If Applicable), Demolition/Deconstruction And Soil And Pyrotechnic Decontamination (If Applicable), The Technical Controller Also Has A Technical Assistance Mission For The Asbestos Removal, Demolition/Deconstruction And Decontamination Project, Which Includes: - Validation Of The Asbestos Removal, Deconstruction And Decontamination Methodology Proposed By The Demolition Work Companies, - In Situ Verification Of The Correct Application Of The Methodology Adopted, - Opinion On The Consequences On The Solidity Of The Works Neighbors And Preserved Existing Ones. The Mission Of The Technical Controller Will Take Place Taking Into Account The Mission Elements Specific To Project Management And Technical Services.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7390f182-9ea3-46e4-a33f-01bbfe88b88d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.