GTR 118246893
Corrigendum - Quotation Are Invited For Supply & Installation Of Wheels/Trolley Arrangement With Parking Jacks
ICB — International Competitive Bid
Closed
Asia
Tender Information
GTR Reference
118246893
Tendering Authority
Subscribe to view
Tender No
2492600562
Financer Name
Self-Funded
Work Title
Corrigendum - Quotation Are Invited For Supply & Installation Of Wheels/Trolley Arrangement With Parking Jacks
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
21-09-2026
Closed
Work Detail
Quotation are invited for Supply & Installation of Wheels/Trolley Arrangement with Parking Jacks. SPECIFICATION FOR SUPPLY & INSTALLATION OF WHEELS/TROLLEY ARRANGEMENTWITH PARKING JACKSFOR: EKOFLUID OIL FILTRATION MACHINEPURPOSE: MOBILE RELOCATION AND LONG-TERM PARKING SUPPORTFOR FURTHER DETAILS OR SITE VISIT PLEASE CONTACT:MOHAMMAD DANISH 0502538032 MOHAMMAD. [email protected] SAYED YASIN 0544605556 [email protected]. SCOPE OF WORKTHE VENDOR SHALL:# INSPECT THE EKOFLUID OIL FI LTRATION MACHINE AT SITE.# DESIGN, SUPPLY, INSTALL, AND COMMISSION A SUITABLE WHEELS/TROLLEYARRANGEMENT WITH INTEGRATED PARKING JACK S.# ENSURE THE SYSTEM IS SUITABLE FOR:O SAFE MANUAL OR ASSISTED RELOCATION OF THE MACHINE ON SITE.O LONG-TERM STATIC SUPPORT (PARKIN G) OF THE MACHINE FOR EXTENDEDPERIODS.# PROVIDE ALL REQUIRED TROLLEY FRAME, WHEELS, BRACKETS, PLATES, ANDSTRUCTURAL MODIFICATIONS.# SUBMIT AS-BUILT DRAWINGS, LOAD CALCULATIONS, DURING QUOTATION PERIOD.2. SITE INSPECTIONBEFORE FINAL DESIGN, THE VENDOR SHALL:# VISIT THE SITE AND RECORD FOR THE MACHINE:O DIMENSIONS, WEIGHT, AND APPROXIMATE CENTER OF GRAVITY.O EXISTING BASE FRAME AND POSSIBLE ATTA CHMENT POINTS FOR TROLLEY ANDJACKS.# SUBMIT A SHORT INSPECTION REPORT AND PROPOSED TROLLEY AND JACK LAYOUTFOR APPROVAL.3. FUNCTIONAL REQUIREMENTS# THE MACHINE SHALL BE MOUNTED ON A DEDICATED TROLLEY/FRAME WITH WHEELSAND INTEGRATED PARKING JACKS.# WHEELS:O SUITABLE FOR SITE FLOOR CONDITIONS AND MACHINE WEIGHT.O AT LEAST TWO SWIVEL CASTERS WITH BRAKES FOR STEERING AND LOCKING.O MATERIAL SUITABLE FOR INDUSTRIAL ENVIRONMENT (E.G., POLYURETHANE ORRUBBER ON STEEL/IRON HUBS).# EACH PARKING JACK SHALL HAVE A CLEARLY MARKED RATED C APACITY.# CAPACITY:O EACH JACK: MINIMUM 1.5 × THE MAXIMUM EXPECTED LOAD ON THAT JACK.O TOTAL JACK SYSTEM CAPACITY: MINIMUM 1.5 × TOT AL MACHINE WEIGHT,CONSIDERING UNEVEN LOAD DISTRIBUTION.# TYPE: HYDRAULIC, MECHANICAL SCREW JACK, OR COMBINED SYSTEM (VENDOR TOPROPOS E MOST SUITABLE AFTER INSPECTION).# FOR LONG-TERM PARKING:O PROVIDE MECHANICAL LOCKS OR DEDICATED PARKING STANDS SO THE MACHINEWEIGH T IS NOT HELD ONLY BY HYDRAULIC PRESSURE.# STROKE: SUFFICIENT TO LIFT THE MACHINE AND WHEELS SLIGHTLY OFF THEGROUND FOR STABLE PARKI NG AND MAINTENANCE (TYPICAL 100#250 MM, SUBJECTTO SITE CONDITIONS).# THE TROLLEY AND JACKS SHALL MAINTAIN STABILITY DURING MOVEMENT, LIFTING, AND IN THE PARKED CONDITION (NO EXCESSIVE TILT OR SWAY).4. STRUCTURAL & INSTALLATION REQUIREMENTS# TROLLEY FRAME AND ALL BR ACKETS, PLATES, AND REINFORCEMENTS SHALL BE:O FABRICATED FROM SUITABLE STEEL WITH CORROSION PROTECTION FIT FOR SITECONDITIONS.# WELD ING AND BOLTING SHALL BE EXECUTED TO GOOD ENGINEERING PRACTICE BYQUALIFIED PERSONNEL.# MODIFICATIONS SHALL NOT COMPROMISE THE ORIGIN AL MACHINE STRUCTURE OROPERATION.# AFTER INSTALLATION, THE VENDOR SHALL:O PERFORM LOAD TESTING OF THE TROLLEY AND JACKS (MINIMUM 1.2 5 × RATEDLOAD).O VERIFY DEFLECTION, ALIGNMENT, STABILITY, AND BRAKING/LOCKING FUNCTION.O PROVIDE A TEST REPORT AND ACCEPTANCE CERTIF ICATE.5. LONG-TERM PARKING SUITABILITY# PROVIDE DEDICATED PARKING SUPPORTS/STANDS THAT:O CARRY THE FULL MACHINE WEIGHT IN THE PARKED CONDITION.O ARE ADJUSTABLE TO COMPENSATE FOR MINOR FLOOR IRREGULARITIES.O HAVE SUFFICIENT BASE AREA TO KEEP FLOOR PRESSURE WITHIN S AFE LIMITS.# HYDRAULIC JACKS SHALL NOT BE THE SOLE LONG-TERM SUPPORT; MECHANICALLOCKS OR SEPARATE STANDS SHALL CARRY SUSTAINED LOADS .# MATERIALS AND COATINGS SHALL BE SUITABLE FOR PROLONGED EXPOSURE TOSITE ENVIRONMENT (INCLUDING POSSIBLE OIL CONTACT).6. DOCUMENTAT ION & TRAININGTHE VENDOR SHALL PROVIDE:# DESIGN CALCULATIONS AND ARRANGEMENT DRAWINGS FOR THE TROLLEY ANDPARKING JACKS.# LOAD TEST R EPORT AND FINAL ACCEPTANCE CERTIFICATE.7. WARRANTY & SUPPORT# MINIMUM WARRANTY: 12 MONTHS FROM COMMISSIONING AGAINST DEFECTS INDESIG N, MATERIALS, AND WORKMANSHIP.# VENDOR SHALL PROVIDE TECHNICAL SUPPORT AND AVAILABILITY OF SPAREPARTS. Qty: 1 Supply & Installation of Wheels/Trolley Arrangement with Parking Jacks For: EKOFLUID Oil Filtration Machine Contact [email protected] STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2492600562)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
29169ae2-4d8b-442a-b606-df4db7cf31c7.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.