GTR 118186891

Tenders Are Invited For Airport Buildings Construction Work – Veb Displacements B10 / B - Bkp 281 Underlay Floors / Seamless Floor Coverings

ICB — International Competitive Bid Closes Oct 26, 2026 Western Europe
Tender Information
GTR Reference
118186891
Tendering Authority
Subscribe to view
Tender No
635979-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Airport Buildings Construction Work – Veb Displacements B10 / B - Bkp 281 Underlay Floors / Seamless Floor Coverings
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Last Date of Bid Submission
26-10-2026
Work Detail
Airport Buildings Construction Work – Veb Displacements B10 / B - Bkp 281 Underlay Floors / Seamless Floor Coverings. Brief Description The Central Infrastructure At Zurich Airport Is Being Gradually Modernized. Over The Past 15 Years, Central Areas Have Been Extensively Overhauled: Dock B Was Completely Redesigned, Terminal 2 Was Fundamentally Renovated And Expanded, And A New Security Control Center Was Built Between Terminals 1 And 2 With Direct Access To The Airside Center. Furthermore, The Baggage Sorting System North Of Terminal 1 And The Entire Baggage Sorting System Were Renewed. The Next Step Is To Renew Those Infrastructure Elements That Have Aged Significantly. Dock A, Including The Tower, Dates From 1985 And Remains Structurally Almost Unchanged. In Terms Of Functionality, Environmental Standards And Construction Quality, It No Longer Meets Current Requirements. A Comprehensive Review Led To The Decision To Replace The Current Dock A With A New Building To The North Of The Existing Building. The Planned New Dock A, The Future Tower And The Completely Renovated Apron, Together With Other Infrastructural Adjustments, Form The Central Structural Projects For The Next 15 To 20 Years. The Implementation Will Take Place In Stages - Under The Premise That Flight Operations Continue To Run Smoothly And The Newly Created Facilities Meet Future Operational Requirements. Following On From The Above-Mentioned Matter, The Project Veb Verdrängung B10 / B (Pa19aa572 Vpk 25-06-007) Deals With The New Construction And Expansion Of The Vip / Eda Lounge, Which Is Now Located Under The Airside Center At Dockroot A. The New Location Is On The South Side Of Terminal 2 On Floors 1 And 2 And Offers Vip Guests A Direct Connection To The Specialist Processes. A New Staff Access To The Airside Will Also Be Created, Which Will Replace The Staff Access In Dock Root A. Short Description Of Tendered Work Short Description Of Tendered Work Repair And Addition Of Existing Subfloors As Well As Creation Of New Subfloors And Installation Of New Epoxy Floor Coverings.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
9580e896-942a-439a-80f0-69264f8116b9.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders