GTR 118088370

Bids Are Invited For Fy 2027 Park Street Drainage Repair Project

ICB — International Competitive Bid Closed Northern America
Tender Information
GTR Reference
118088370
Tendering Authority
Subscribe to view
Tender No
PE-66204-NONST-2027-000000004
Financer Name
Self-Funded
Work Title
Bids Are Invited For Fy 2027 Park Street Drainage Repair Project
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia-Pacific Economic Cooperation, APEC,APAC (Asia Pacific)
Last Date of Bid Submission
14-10-2026 Closed
Work Detail
1.Replacement Of Cmp Culvert Under Industrial Parkwaya.Contractor Will Follow Gdot Specifications To Replace A Damaged Culvert Under Industrial Pkwy.B.Contractor Must Use Rcp And The Culvert Size Will Be Increased To 30¿C.Culvert Will Be Placed On A Minimum Of 12¿ Of Foundation Backfill.D.Culvert Will Receive Gdot Safety Flared End Sectionse.Head And Tail Ditch To Be Excavated To Match New Culvertf.Culvert To Be Relocated 2¿ Further Away From The Edge Of Park Street.G.Culvert To Be Backfilled With 57 Stone And Or Compacted Gab Within 6¿ Of Finished Grade. Final 6¿ To Be Paved, Following Gdot 1401 Detail.H.Industrial Pkwy May Be Closed To Traffic During Culvert Replacement For Up To 3Days.I.City Will Assist With Walton Emc Coordination.J.Contractor Must Call 811 And Coordinate Any Other Utility Conflict Resolutions.2.Regrade And Stabilize Multiple Ditch Sections Along Park Street (60¿ Row)A.Contractor To Excavate And/Or Fill Eroded Ditch Sections Along Both Sides Of Park Street. All Work To Be Inside Of Public Right-Of-Way Or With Signed Right-Of-Entry, Acquired By The City.B.All Areas To Be Stabilized At The End Of Each Day With Bmps, Which May Include Temporary Cover And Matting, Ditch Checks, Or Other Erosion Control Bmps.C.All Ditches Impacted Must Receive 2¿ Flat Bottom And Appropriate Side Slopes, Graded And Compacted To Minimize Long-Term Erosion.D.All Driveway Culverts Will Be Fully Exposed And Sedimentation Removed.E.All Ditches To Receive At Least Matting, Grassing, And Fertilization. If Off-Season Or Temporary Grasses Used, Contractor Will Be Required To Regerminate Warm-Weather Grass.F.Contractor Will Be Responsible For The Project Until 85% Stand Of Permanent Grass.G.Sod Matching Adjacent Yard Will Be Utilized Over Any Disturbed Area Greater Than4¿ From The Edge Of The Bottom Of The Ditch.H.Sod May Be Used In The Ditch But Must Be Staked.I.Approximate Areas Of Particular Concern Are Noted Below But Are Not Exhaustive.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c30dadf2-c3b7-4b1f-9859-51fccec426d3.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you