GTR 117929449

Bids Are Invited For 50265Noi Ubch Koerner Hawk Boiler Controls Upgrade

ICB — International Competitive Bid Closes Sep 21, 2026 Northern America
Tender Information
GTR Reference
117929449
Tendering Authority
Subscribe to view
Tender No
233887
Financer Name
Self-Funded
Work Title
Bids Are Invited For 50265Noi Ubch Koerner Hawk Boiler Controls Upgrade
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia-Pacific Economic Cooperation, APEC,G20,APAC (Asia Pacific)
Last Date of Bid Submission
21-09-2026
Work Detail
Notice Of Intent To Direct Awardubch Koerner Hawk Boiler Controls Upgradeproject Number: 50265Noivancouver Coastal Health (Vch) Intends To Proceed With The Koerner Boiler Controllers Upgrade Project, Located At The Koerner Pavilion On The Ubc Hospital (Ubch) Campus, Project Number 50265. The Contractor And The Estimated Value Of The Work Will Be:Cannepp Boiler Room Technologies At Unit #6 – 7449 Hume Ave, Delta, Bc V4g 1C3estimated Budget: $220,000-$320,00 Plus Gstrequired Completion: October 23, 2026The Scope Of Work Includes The Control Upgrade For Three (3) Existing Cleaver Brooks Firetube Hot Water Boilers (Cb200-200) At The Koerner Pavilion, Ubc Hospital. This Upgrade Will Install The Cleaver Brooks Hawk 1000 Controls Package With Required Combustion Controls Including Precision Fuel-Air Control, O₂ Trim And Combustion-Air Vsd Control And Burner Management Maintained As A Separate Safety Device From Combustion Control. Integrated Boiler Sequencing And Built-Intwo-Boilerlead-Lag Is Another Required Function To Enable Better Control And Extend Asset Life. Required Technical Installation Services:Supply, Install, Commission. Provide Cleaver Brooks Factory Certified Burner And Controls Technician To Start Up, Test, Demonstrate And Train On Site Operators. Provide Documentation Including Operation & Maintenance Manuals, Boiler Wiring Diagrams, Startup Reports, Inspection Certificates. Local Service And Support Available. Vch Has Chosen To Direct Award The Contract For The Following Reasons:Technical Compatibility And Local Servicethe Three (3) Cleaver Brooks Hot Water Boilers Currently Use A Honeywell Flame Controller To Regulate The Fuel-To-Air Ratio. This Controller Was Declared Obsolete And Replacement Parts Are No Longer Available. A Failure Of The Controller Will Have Direct Impact On Space And Domestic Hot Water Heating, Critical For Patient Care And Lab Spaces In Koerner Pavilion. The Cleaver Brooks Hawk 1000 Controller Package Will Control Cleaver Brooks Cb200-200 Boilers, This Is The Lowest Risk Controller With Boiler-Specific Engineering And Existing Cleaver-Brooks Service Relationship. The Hawk 1000 Controls Have Tested Wire-For-Wire Compatibility With The Existing Cleaver-Brooks Integral Burners, Gas Valves, Oil Controllers, Scanners, Limit Circuits, And Actuator Mounting Hardware And Geometry. Cannepp Is The Contractor Servicing The Boilers At Ubch And The Only Authorized Representative For Cleaver Brooks In Bc. Cost Considerationsproceeding With The Hawk 1000 Upgrade With Cannepp Allows The Utilization Of The Existing Platform And Infrastructure. Switching To Another Control System Would Require Additional Investments In New Control Software, Licenses, Engineering Reprogramming, And Staff Retraining. Cannepp Is An Approved Natural Gas Equipment Supplier For Fortisbc, Offering Commercial And Industrial Boiler Solutions Eligible For Energy-Efficiency Rebates. The Hawk 1000 Controller’S Operational Performance Has Been Vetted By Fortisbc And Will Attract A $49K Incentive For Each Boiler. An Alternate Controller That Is Not Oem May Put This Incentive At Risk.Schedule And Risk Mitigationcannepp’S Familiarity With The Existing System Allows For A Streamlined Design, Installation, And Commissioning Process, Reducing The Project Timeline And Risks. Other Vendors Would Require Additional Effort And Time To Reverse-Engineer Existing Sequences And Integrate With Incompatible Systems. The Required Completion Date Of October 23, 2026 Is Assertive To Ensure This Installation Can Occur Before Heating Demand Increases. Delaying This Work Adds Operational Risks That Can Impact Patients And Staff. Service Agreement Alignmentcannepp Is The Only Authorized Vendor In Bc For Servicing And Maintaining Cleaver Brooks Boilers. Adding A Different Vendor’S System Would Create Service Gaps And Complicate Future Maintenance And Support Responsibilities.Contractors May Challenge This Decision By Sending An Email Tothe Undersigned By September 21, 2026, At 15:00 Local Time.Provide Proof Showing Your Equivalent Healthcare Project Experiences, Ability To Meet The Requirements And Project Timeline Stated In This Notice Of Intent. Maggie Laifacilities Management [email protected]
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a803306d-acff-4f09-9463-a2bf9ad62ff2.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders