GTR 117886673
Tenders Are Invited For Reconstruction Of The Drl Forest Road No. 7/07 In The Okółek Forestry, Passing Through Sections 652, 680, 719, 718, 760, 759 And 758
ICB — International Competitive Bid
Closes Sep 23, 2026
central europe
Tender Information
GTR Reference
117886673
Tendering Authority
Subscribe to view
Tender No
S.270.13.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Drl Forest Road No. 7/07 In The Okółek Forestry, Passing Through Sections 652, 680, 719, 718, 760, 759 And 758
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
23-09-2026
Work Detail
The Subject Of The Order Are Construction Works Under The Name: Reconstruction Of The Drl Forest Road No. 7/07 In The Okółek Forestry, Passing Through Sections 652, 680, 719, 718, 760, 759 And 758. There Are No Underground Utilities Within The Work Area. The Road Runs Through A Flat Forested Area, The Slope Does Not Exceed 5%. Road Parameters: - Road With Shoulders. (Road Crown) - 4.00 M, - Road Width: 3.00 M, - Width Of Hardened Shoulders: 2 × 0.50 M, - Longitudinal Slope - 0.80% - 4.50%, - Cross-Roof Slope On The Straight - 2%, - Transverse Slope Of The Roadsides - 6%, - Longitudinal Slope Of The Roadsides - Consistent With The Slope Of The Adjacent Access Road, - Curves Rounding - R = 2.00-30.00 M. The Following Communication Devices Are Planned Along The Designed Route: - Intersections - 8 Pcs., - Clarifiers - 19 Pcs., - Passing Places - 6 Pcs. Construction Of Access, Exits And Passing Places: - Upper Layer Of The Road Made Of Mechanically Stabilized Natural Aggregate (Gravel) 0-31.5 Mm, Thickness. 20 Cm After Compaction, - The Upper Layer Of The Roadside Is Made Of Mechanically Stabilized Natural Aggregate (Slurry), 0-31.5 Mm Thick. 20 Cm After Compaction, - Profiled And Compacted Subsoil. Mechanical Compaction. Road Surface Compaction Factor 0.98. The Soil Compaction Factor Is 0.95. It Is Allowed To Change The Location Of Passing And Settling Tanks Up To A Distance Of 100 M Due To The Existing Trees. Drainage: Surface Drainage Is Designed Through Appropriate Profiling Of The Road Crown Into The Forest Area And Through Designed Evaporation Tanks (19 Pcs.). It Is Necessary To Clear Out 635 Stumps And Transport Them A Distance Of Up To 5 Km To An Agreed Location. Due To The Need To Construct Embankments, Attention Should Be Paid To The Careful Profiling And Correct Compaction Of The Embankment Soil And The Individual Surface Layers Of The Communication Facilities. The Length Of The Reconstructed Road Is 2,813.95 M. The Contractor Is Obliged To Reconstruct The Forest Road In Accordance With The Description Of The Subject Of The Order Included In The Design Documentation, Technical Specification For The Execution And Acceptance Of Works (Stwior), Bill Of Quantities And In Accordance With Current Technical Knowledge, Principles Of Construction Practice And Provisions Of The Swz. It Is Recommended That Contractors, Before Submitting An Offer, Make A Local Visit To The Area Covered By The Order In Order To Assess The Conditions For The Implementation Of The Works. The Ordering Party Does Not Allow The Submission Of Equivalent Offers. To Perform The Subject Of The Order, The Contractor Will Provide All Necessary Tools, Materials And Equipment.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
3d243703-b3fb-4e2e-a6b2-37396953329d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.