GTR 117876404

Tenders Are Invited For Rso Optimization A12 Loop Stabroek And Opstalvallei Phase 1 Berendrecht

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
117876404
Tendering Authority
Subscribe to view
Tender No
PPP0XC-2169/6024/ANB-GI-INRW-2026-100_001
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Rso Optimization A12 Loop Stabroek And Opstalvallei Phase 1 Berendrecht
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union
Last Date of Bid Submission
09-10-2026 Closed
Work Detail
The Project Area Of ​​The A12 Loop (Sub-Area 1 - Plot 1) Is Located In The Antwerp Port Area North Of Antwerp On The Right Bank Of The Scheldt At The Liberation Dock. The Project Zone Is Located In An Entrance/Exit Complex Of The A12 Between Antwerp And Zandvliet At The Intersection With R2. The Drainage Ditch Crosses The Zone Centrally From North To South With A Weir In The South And In The Northern Part The Kleine Watergang Joins The Drainage Canal. Both East And West Of The Drainage Canal, There Are Two Loops That Are Not Completely Closed. On The Western Side They Are Smaller Than On The Eastern Side Of The Central Moat. In The Southeastern Loop There Is An Electricity Pylon That Must Of Course Be Taken Into Account In The New Design. There Is One Management Road Around The Area That Is Used For Maintenance And Management Works. Within This Zone, The Breeding Ground For The Black-Headed Gull Will Be Redesigned. In The Current Situation, The Loops On The East Side Of The Drainage Ditch Are Not Completely Closed, Allowing Predators To Enter The Islands. The New Design Effectively Creates Islands That Are Then Additionally Protected Against Predators. For This Purpose, The Relief Will Be Partially Adjusted And Small-Scale Paving Will Also Be Provided For The Management Of The Islands. Furthermore, Some Technical Works Are Being Carried Out In Connection With Additional Reed Development, A Bank Martin Wall And The Retention Of Water Around The Islands. In The North Of The Project Area, Some Relief Changes Are Also Being Carried Out To Further Complete The Existing Berm Around The Project Area. The Project Area Of ​​The Opstalvallei Phase 1 (Sub-Area 2 - Plot 2) Is Located In The Antwerp Port Area North Of Antwerp On The Right Bank Of The Scheldt At The Liberation Dock. “Opstalvallei Phase 1 Was Developed In 2008 To Compensate For The Commissioning Of The Lake At Hooge Maey In The Context Of The Amoras Project.” This Zone Is Today A Nature Reserve With An Approved Management Plan. There Is Already A Large Pond And A Lot Of Reed Vegetation In The Center. In The Southeast, The Afwateringsgracht Makes A 180° Bend And Then Leaves The Area Back Towards The A12 Loop. In The North The Area Is Bordered By A Cycle Path (Reigersbosdreef) And In The South By A Track Complex. The Village Stream Crosses The Area Via The Western And Southern Edges And Then Joins The Drainage Canal. In The East The Area Is Bordered By The Antwerpsebaan And In The West By A Green Zone That Then Connects To The Large Harbor Dock. The Planned Works Are Located Within The Opstalvallei Phase 1 Nature Reserve And Are Part Of An Approved Nature Management Plan For The Area. For This Purpose, Some Relief Changes Are Carried Out And Combined With Some Technical Works.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
0cc9dec3-7d56-47c8-91c7-69df4c4c6414.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you