GTR 117665704
Bids Are Invited For Plan No.: 024177 Edmonton - Government Centre - Powerhouse Chiller Replacement
ICB — International Competitive Bid
Closes Sep 24, 2026
Northern America
Tender Information
GTR Reference
117665704
Tendering Authority
Subscribe to view
Tender No
AB-2026-06107
Financer Name
Self-Funded
Work Title
Bids Are Invited For Plan No.: 024177 Edmonton - Government Centre - Powerhouse Chiller Replacement
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia-Pacific Economic Cooperation, APEC,G20,APAC (Asia Pacific)
Last Date of Bid Submission
24-09-2026
Work Detail
.1Work Is To Be Executed Within An Active Powerhouse Facility That Will Remain Operational Throughout The Construction Period. The Contractor Shall Plan And Coordinate The Work In A Manner That Accommodates Ongoing Facility Operations And Continued Occupancy By Government Of Alberta Personnel..2Existing Facility Operations Are Critical To Building Functionality. Construction Activities Shall Be Planned And Coordinated To Maintain Required System Operation Throughout The Project, Except Where Approved Outages Have Been Authorized By The Province..3Replacement Equipment And Associated Controls Shall, At A Minimum, Maintain Operational Functionality Consistent With The Systems Being Replaced, Including Integration With Existing Facility Operational Practices And Remote Operating Capabilities. Any Identified Discrepancy Between The Contract Documents And These Requirements Shall Be Brought To The Attention Of The Consultant..4The Contractor Is Advised That Existing Cooling Systems May Be Required To Remain Operational During Portions Of The Construction Period. Scheduling And Sequencing Of The Work Shall Account For Seasonal Operating Requirements And Facility Cooling Demands..5The Contractor Is Advised That Project Sequencing May Require Portions Of The Existing Cooling System To Remain Operational Or Alternatively Require Portions Of The New Cooling System To Be Commissioned And Operational By Fall 2027, While Construction Activities Remain Ongoing. Proponents Shall Account For This Requirement When Developing Their Construction Approach, Schedule, Outage Planning, And Temporary Operating Strategies. .6The Contractor Is Advised The Controls Design Approach Is Intended To Maintain Compatibility And Integration With The Existing Delta Emcs Platform Used Throughout The Powerhouse, Including The Cooling Tower System, And To Support Continuity Of Facility Operations During And After Implementation..7The Removal Of Two Existing Chillers, Associated Condenser Water Pumps And Chilled Water Pumps. Replacement Of The Equipment With New Chillers And Pumps.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e77158c3-3050-4930-b296-4b1282ca8c8f.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.