GTR 117647226

Tenders Are Invited For Construction Work - Preparation Of Design Documentation And Construction Works For The Task Entitled: Reconstruction Of Retention Reservoirs In The Wielkie Oczy Forestry And Reconstruction Of A Culvert Into A Bridge On The Forest Road, Inventory No. 220/1139

ICB — International Competitive Bid Closes Sep 30, 2026 central europe
Tender Information
GTR Reference
117647226
Tendering Authority
Subscribe to view
Tender No
598165-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work - Preparation Of Design Documentation And Construction Works For The Task Entitled: Reconstruction Of Retention Reservoirs In The Wielkie Oczy Forestry And Reconstruction Of A Culvert Into A Bridge On The Forest Road, Inventory No. 220/1139
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
30-09-2026
Work Detail
Construction Work - Preparation Of Design Documentation And Construction Works For The Task Entitled: Reconstruction Of Retention Reservoirs In The Wielkie Oczy Forestry And Reconstruction Of A Culvert Into A Bridge On The Forest Road, Inventory No. 220/1139. 1) The Subject Of The Order Is The Design, Obtaining All Legally Required Consents And Permits Necessary To Obtain A Building Permit And Commencement Of Construction Works, Performance Of Construction Works Based On The Obtained Documents, Preparation Of A Natural Inventory Before The Commencement Of Construction Works And After Their Completion For The Task Reconstruction Of Retention Reservoirs In The Wielkie Oczy Forestry And Reconstruction Of A Culvert To A Bridge On The Forest Road No. 220/1139 With The Following Parameters: 1.1 Reconstruction Of Retention Reservoirs In The Wielkie Oczy Forestry With The Following Parameters: The Subject Of The Implementation Is The Restoration Of Retention Reservoirs With A Total Area Of Approximately 3.0 Ha, Along With The Construction Of Earth Dikes And Hydrotechnical Devices, Including 5 Emergency Overflows. Basic Parameters Of 5 Reservoirs - Total Area: Approx. 3.0 Ha (30,000 M²) - Average Depth: 1.2 M - Total Retention Capacity: Min. 28,000 M³ - Total Length Of 5 Dikes With A Crown Width Of 2-3 M In Total: Approx. 270 M (5 Sections), The Scope Of Earthworks Includes: - Shaping The Reservoir Bowl, Including Profiling The Reservoir Bottom And Internal And External Slopes, - Construction Of Earth Dikes, - Construction Of 5 Spillways/Rapids. The Bottom Of The Reservoir Will Remain Partly In Its Current Form And Form, And Partly, As Described Above, It May Be Deepened To Collect Material For The Construction Of Earth Dikes. The Following Depth Variations Were Assumed: - Coastal Zone: 0.3–0.8 M, - Central Zone: 0.5–1.0 M, - Deep Zone: Up To Approx. 2.0 M. Slope Inclination: Internal Slopes: 1:2 To 1:5, Earthen Dykes - It Is Planned To Construct Five Dykes With A Total Length Of Approx. 270 M. Parameters: - Crown Width: 3.0–4.0 M, - Height: Approx. 2.0, - Slope Inclination: 1:2 -1:3 The Dikes Will Be Made Of Mineral Soil Extracted From The Reservoir Bowl And Compacted In Layers. In The Case Of Permeable Soils, It Is Planned To Make A Sealing Core Of Cohesive Soils. Overflows/Rapids In Order To Ensure Hydrological Safety, 5 Overflows/Rapids Were Designed To Enable Constant Water Flow - Maintaining A Constant Flow And Draining Excess Water. Balance Of Earth Masses The Volume Of Earthworks Related To The Formation Of The Reservoir Bowl Is: Volume Of Embankments (Dikes) Assuming An Average Cross-Sectional Area Of The Dikes Of Approx. 9.0 M²: V ≈ 270 M × 9.0 M² = 2,430 M³ After Taking Into Account Technological Losses And Compaction: 👉 Approx. 2,500 - 3,000 M³ Balance Sheet Volume Of Excavations: 2,500 - 3,000 M³ Volume Of Embankments: Approx. 2,500 - 3,000 M³ Surplus Of Excavated Material: 0 M³ Management Of Excavated Material All Excavated Material Will Be Used In The Investment Area For: Building Dikes, Shaping Slopes, Leveling The Area. It Is Estimated That 100% Of The Excavated Material Will Be Used On Site. • All Design Solutions Will Require Ongoing Approval Of The Ordering Party. 1.2. The Subject Of The Planned Project Is The Reconstruction Of The Existing Culvert Into A Bridge
Key Value
Tender Value
2,015,000 - PLN
Tender Documents
Global Tender Document
a219e2a3-3f81-4dd7-8212-54b62b1ebd6d.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders