GTR 117620253

Tenders Are Invited For Scaffolding Work – Sv-Mbr-260831-003 - Sot - Renovation Of The Olympic Tower And Atrium, Scaffolding Work

ICB — International Competitive Bid Closes Oct 01, 2026 Western Europe
Tender Information
GTR Reference
117620253
Tendering Authority
Subscribe to view
Tender No
605983-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Scaffolding Work – Sv-Mbr-260831-003 - Sot - Renovation Of The Olympic Tower And Atrium, Scaffolding Work
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
01-10-2026
Work Detail
Scaffolding Work – Sv-Mbr-260831-003 - Sot - Renovation Of The Olympic Tower And Atrium, Scaffolding Work. Main Part 01 - Room Scaffolding - Mail Basket Level 530M² Cylinder Base Area Average Height Approx. 6M Rope Platform Height Difference Loading Height/Unloading Height Approx. 170M Main Part 02 - Room Scaffolding - Visitor Basket, Facade Portion 163M² Cylinder Base Area Facade Scaffolding Height Approx. 17.1M The Reference Area = Facade To Be Renovated Is 1,100M2 Of Scaffolding Work From Level +167.70 To E.G. Approx. +193.00. Correspondingly As A Round Framework Or Segmented Shape Following The Diameter Of The Tower. The Floor Plan Is Divided Into 36 Individual Fields, Which Have Identical Widths Across All Floors. The Framework Geometry Must Therefore Be Based On This Radius Of The Basic Geometry. The Erection And Transport Of The Individual Scaffolding Parts To The Height For Scaffolding Part 1 - Mail Basket Ok - Approx. +167.70 To Approx. 179.00 Is Considered A Substructure For The Actual Facade Scaffolding, Which Is Necessary For The Renewal Of The Facade From 179.15 To Approx. 191.00M Parapet Ok Terrace Level 14 - Visitor Platform. The Scaffolding Planning Specifies Full Scaffolding. The Full Scaffolding Has A Weather Protection Cover, Which Allows The Scaffold Users To Work In All Weather Conditions. The Cover And All Associated Measures Ensure Fall Protection. The Fall Of People And Parts (Facade Parts, Tools, Fasteners, Assembly Aids, Etc.) Must Always And Fundamentally Be Ruled Out. The Lifting Equipment For Your Own Material Is The Responsibility Of The Scaffolding Contractor (The Internal Elevators Can Be Used Free Of Charge)
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
ade4990f-ee3c-426a-b910-e83cb5e1d322.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders