GTR 117574405

Quotation Are Invited For Upgradation, Modification, Testing And Commissioning Of 4 Pole, 400Asocomec Ats Controller With Schneider Ua (With A Cp + Ive) Controller, 3-Phase With Neutral Monitoring, 400V, 50Hz, Mechanical & Electrical Interlock, Etc

ICB — International Competitive Bid Closed Asia
Tender Information
GTR Reference
117574405
Tendering Authority
Subscribe to view
Tender No
2412601430
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Upgradation, Modification, Testing And Commissioning Of 4 Pole, 400Asocomec Ats Controller With Schneider Ua (With A Cp + Ive) Controller, 3-Phase With Neutral Monitoring, 400V, 50Hz, Mechanical & Electrical Interlock, Etc
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
03-09-2026 Closed
Work Detail
Quotation are invited for Upgradation, Modification, Testing and Commissioning of 4 Pole, 400asocomec Ats Controller with Schneider UA (with a CP + IVE) Controller, 3-Phase with Neutral Monitoring, 400V, 50HZ, Mechanical & Electrical Interlock and Complete Accessories and Wiring Harness. SCOPE OF WORK:·# UPGRADATION, MODIFICATION, TESTING AND COMMISSIONING OF 4POLE, 400ASOCOMEC ATS CONTROLLER WITH SCHNEIDER UA (WITH A CP + IVE) CONTROLLER, 3-PHASE WITH NEUTRAL MONITORING, 400V, 50HZ, MECHANICAL & ELECTRICAL INTERLOCK AND COMPLETE ACCESSORIES AND WIRI NG HARNESS.·#REMOVAL OF EXISTING SOCOMEC CONTROLLERS AND ITS RELATED ACCESSORIES,INSTALLATION OF NEW CONTROLLERS WITH ACCESSORIES & MODIFICATION OFWIRINGS AS PER SCOPE ABOVE SHALL BE INCLUDED IN THE OFFER.·#CABLE TERMINATION OF INCOMING AND OUTGOING CABLES IF REQU IRED.·#POWER MONITORING UNIT & STATUS INDICATOR LEDS SHALL BE FITTED WITHATSS.·#ATS ENCLOSURE MODIFICATION IF REQUIRED.·#ALL NECESSA RY REQUIREMENTS, INCLUDING MOBILIZATION ANDDEMOBILIZATION, LOADING AND UNLOADING, TRANSPORTATION, TEST EQUIPMENT,ETC. SHALL BE ARRAN GED BY THE CONTRACTOR.·#SAFETY & ENVIRONMENTAL CONDITIONS COMPLIANCE, WITH RISK ASSESSMENT TOINCLUDE HOT WORKS & CONFINED SPACE AND TO BE SUBMITTED FOR THE SUBJECTWORKS.·#PROVIDE ON-SITE O&M TRAINING FOR DEWA PALACE PERSONNEL.·#ADDITIONAL SCOPE AS DISCUSSED DURING SITE INSPECTION SHALL BECONSIDERED AND WILL BE CONFIRMED THROUGH EMAIL.·#A #SITE ACCEPTANCE TEST# OF ATS PANEL HAVE TO BE CARRIED O UT AS PERTHE OEM RECOMMENDATION / CRITERIA IN PRESENCE OF DEWA REPRESENTATIVES.·#EQUIPMENT FACTORY TEST RESULTS SHALL BE SUBMITTED P RIOR COMMENCEMENTOF WORK.·#COPIES OF FINAL "AS BUILT" ELECTRICAL DRAWINGS AND DIAGRAMS (2 HARDCOPIES AND SOFT COPY) SHALL SUBSEQUENT LY BE ISSUED AND SUBMITTED TODEWA.·#DRAWINGS SHALL BE TO SCALE AND FULLY DETAILED. ALL-IMPORTANTDIMENSIONS SHALL BE GIVEN AND THE MA TERIAL OF EACH PART SHALL BEINDICATED EITHER ON THE DRAWING OR IN SEPARATE LIST. AND IT SHOULD HAVEA TITLE, SERIAL NUMBER, ISSUE REC ORD AND SCALE.·#PERIOD OF TOTAL WORK COMPLETION INCLUDING TECHNICAL SUBMITTAL,INSTALLATION, TESTING AND COMMISSIONING.·#WARRANTY PER IOD.·#WORK EXECUTION IS SUBJECTED TO PALACE AUTHORITY APPROVAL. DEWA IS NOTRESPONSIBLE ABOUT ANY DELAY IN COMPLETING THE PROJECT DUE TO NOTOBTAINING PALACE#S AUTHORITY APPROVAL TO START THE WORK.INSPECTION & TESTING:A. A #SITE ACCEPTANCE TEST# OF EACH ATS PANEL HA VE TO BE CARRIED OUT ASPER THE OEMRECOMMENDATION / CRITERIA IN PRESENCE OF DEWA REPRESENTATIVES.B. EQUIPMENT FACTORY TEST RESULTS SHALL BE SUBMITTED PRIOR COMMENCEMENTOF WORK.THE TENDERER MUST SUBMIT WITH HIS OFFER BROCHURES, CATALOGUES, DETAILEDBILL OFMATERIALS W ITH QUANTITY AND DETAILED CONSTRUCTION DRAWINGS TO DESCRIBETHE PROPOSALS FULLY.ALL DRAWINGS SHALL BE TO SCALE AND FULLY DETAILED. AL L-IMPORTANTDIMENSIONS SHALL BE GIVENAND THE MATERIAL OF EACH PART SHALL BE INDICATED EITHER ON THE DRAWINGOR IN SEPARATE LIST.ALL DR AWINGS SHALL HAVE A TITLE, SERIAL NUMBER, ISSUE RECORD AND SCALE.TITLE SHALL INCLUDETHE NAMES AND ADDRESSES OF THE PURCHASER AND THE TENDERER.COPIES OF FINAL "AS BUILT" ELECTRICAL DRAWINGS AND DIAGRAMS (2 HARDCOPIES AND SOFTCOPY) SHALL SUBSEQUENTLY BE ISSUED AND S UBMITTED TO DEWA.DEFECT LIABILITY PERIOD (DLP)CONTRACTOR SHALL ENSURE THE PROPER OPERATION OF THE EQUIPMENT AFTERPROJECT TAKEOVER.WA RRANTY OF 1 (ONE) YEAR FROM THE DATE OF TAKEOVER CERTIFICATE FOR THESUPPLIEDEQUIPMENT/PARTS AGAINST ANY MANUFACTURING DEFECTS & WORK MANSHIP SHALL BEPROVIDED.DURING THE WARRANTY PERIOD, ANY SERVICES OF SPECIALIST REQUIRED TORECTIFY ANY PROBLEMSSHOULD BE PROVIDED WI THOUT ANY COST TO DUBAI ELECTRICITY & WATERAUTHORITY (DEWA).SITE LOCATION:THE NEW WORK SHALL BE CARRIED OUT AT SITE OR NEW PANEL SHA LL BEDELIVERED, INSTALLED &COMMISSIONED AT SITENOTES: -(1) CONTRACTOR IS ADVISED TO VISIT THE SITE TO ASSESS THE SCOPE OF WORK.NECES SARYASSISTANCE WILL BE PROVIDED BY DEWA FOR THE INSPECTION AND GETTINGAVAILABLEINFORMATION/ DOCUMENTS. FOR ANY QUERY/ APPOINTMENT, P LEASE CONTACT04-8140305AND 04-8140108.(2) THE CONTRACTOR SHALL ENSURE AND CONFIRM TO DEWA THAT THERE AREADEQUATE SPARESAVAILABLE WIT HIN UAE FOR THE REQUESTED JOB. AVAILABILITY OF SPARES SHALLBE OF AT LEASTFIVE (5) YEARS.(3) THE CONTRACTOR SHALL OBTAIN ALL THE NECE SSARY APPROVALS / CLEARANCEFROM THE UTILITYAUTHORITIES BEFORE EXECUTING THE WORKS.(4) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DA MAGES TO THE EXISTINGSYSTEM AND PARTSSUPPLIED BY HIM DURING EXECUTION OF JOB.(5) IF THE PROPOSED EQUIPMENT FEATURES DEVIATE FROM OEM , DEWA PRIORAPPROVAL SHALL BEGRANTED.(6) THE WORK WILL BE TIME-BOUND & TO BE COMPLETED WITHIN THE REQUESTEDOUTAGE TIME.(7) WORK EXEC UTION IS SUBJECTED TO PALACE AUTHORITY APPROVAL. DEWA ISNOT RESPONSIBLE ABOUTANY DELAY IN COMPLETING THE PROJECT DUE TO NOT OBTAININ G PALACE#SAUTHORITY APPROVAL TO STARTTHE WORK.(8) PAYMENTS WILL BE PROCESSED ACCORDING TO EACH SITE COMPLETION. Qty: 1 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412601430)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
9a786517-47c0-4142-aade-0044711bb535.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail