GTR 117449464
Tenders Are Invited For Environmental Engineering Consultancy Services – N05.80 Mp-220010 - Em Bözingenfeld - Lengnau - Environmental Project Author (Incl. Ubb And Noise) (Id 12060) Phase Mk / Ap – Ibn / Conclusion
ICB — International Competitive Bid
Closes Oct 16, 2026
Western Europe
Tender Information
GTR Reference
117449464
Tendering Authority
Subscribe to view
Tender No
583968-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Environmental Engineering Consultancy Services – N05.80 Mp-220010 - Em Bözingenfeld - Lengnau - Environmental Project Author (Incl. Ubb And Noise) (Id 12060) Phase Mk / Ap – Ibn / Conclusion
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Last Date of Bid Submission
16-10-2026
Work Detail
Environmental Engineering Consultancy Services – N05.80 Mp-220010 - Em Bözingenfeld - Lengnau - Environmental Project Author (Incl. Ubb And Noise) (Id 12060) Phase Mk / Ap – Ibn / Conclusion. The Project Perimeter Is Located In The National Road Section N05.80, Bözingenfeld – Lengnau And Includes The Section Of The Bözingenfeld Junction Up To The Leugene Bridge Object (Bs 20), From Km 73.965 To Km 81.195. This Corresponds To A Length Of Km 7.23. The Section Of The N16 Between Vzw Bözingenfeld And The Pont Sur T5 Bridge (D01) Belongs To The Maintenance Section N05.80. This Section Of The Route Was Mostly Built Between 1998 And 2000 And Was Put Into Operation In 2001. The Bözingenfeld N16 Underpass (Bs 03) Was Built In 2020. This Is The National Road N05, 1St Class, Which Is Owned By Astra. In The Project Perimeter There Are 8 Overpasses, 4 Underpasses, 4 Culverts, 1 Trough, 6 Retaining Walls, 1 Tunnel, 5 Noise Barriers, 5 Noise Barriers, 2 Oil Retention Basins, 2 Pump Shafts And 20 Signal Portals. The Renovation Includes The Following Work: Replacement Of Decking On The Entire Route, The Conversion Of The 4 Rain Retention Basins, Various Concrete Renovations On Engineering Structures And In The Pieterlen Tunnel, Local Reinforcement Of Signal Carriers, Various Hydrophobization On Engineering Structures, Replacement Of The Surface Protection System In The Pieterlen Tunnel, Markings, Signaling And Lighting On The Entire Route. In Addition, The Accident Hot Spots Biel Ost / Vzw Bözingenfeld And Lengnau Are Being Checked For Traffic Reasons And It Is Assumed That Structural Measures Will Be Necessary. This Procurement Contains The Mandate Of Environmental Project Author (Including Ubb And Noise) For The Phases Mk / Ap With Pgv (Procedural Support, Handling Of Objections) To Implementation / Ibn Using The Bim Planning Method.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
496e6fbc-8cd1-49c0-8566-509113bd7448.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.