GTR 117449157
Tenders Are Invited For Engineering Services – N01.20 Mp-260003 - Ep Weyermannshaus - Wankdorf - Project Author Construction (Id 12162)
ICB — International Competitive Bid
Closes Oct 12, 2026
Western Europe
Tender Information
GTR Reference
117449157
Tendering Authority
Subscribe to view
Tender No
585938-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Services – N01.20 Mp-260003 - Ep Weyermannshaus - Wankdorf - Project Author Construction (Id 12162)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Last Date of Bid Submission
12-10-2026
Work Detail
Engineering Services – N01.20 Mp-260003 - Ep Weyermannshaus - Wankdorf - Project Author Construction (Id 12162). The Bern City Tangent Is One Of The Most Heavily Frequented National Road Sections. In The Years 2008 – 2012, The City Tangent Was Extensively Renovated, With The Pavements Being Replaced And Numerous Inventory Objects Being Renovated And Strengthened. In Addition, Noise Protection Was Expanded In The Affected Sections And Adapted To The Requirements At The Time. Around 15 Years Have Now Passed And The Condition Of The Surface Layers Has Noticeably Deteriorated. In Recent Years, Pavement Damage Has Increased, Which Has Led To An Increase In Short-Term Maintenance Measures (Kbu). A Uema Pavement Replacement And A Maintenance Project Are Therefore Being Carried Out Within The Project Perimeter. The Project Perimeter Includes The Following Four National Road Sections: · N01.16 (Bethlehem - Forsthaus Junction) · N01.20 (Forsthaus - Wankdorf Junction) · N06.32 (Wankdorf Junction - Wankdorf Junction) · N12.84 (Bümpliz Junction - Weyermannshaus Junction) This Procurement Contains The Mandate Project Author Construction For The Bridging Measure (Phases 32-53) And The Conservation Project (Phases Conservation Concept (Ek) Up To And Including The Plan Approval Process (Pgv) - The Project Is Created Using The Bim Planning Method. Description Of The Mandate Project Author Construction: · Bridging Measure (Uema) Pavement Replacement (Planning + Implementation) · Maintenance Concept (Ek) Up To Plan Approval Process (Pgv) During The Planning And Implementation Of The Uema Pavement Replacement, A Maintenance Concept (Ek) Should Be Developed. A Maintenance Concept (Ek) Should Be Drawn Up For The Section Based On The Condition Assessment Provided By Astra And Additional Condition Assessments To Be Carried Out By The Contractor. The Contractor Will Then Support The Project Up To And Including The Planning Approval Process (Procedural Support, Handling Of Objections). - Route / Environment: 42 - Engineering Structures: 52 - Tunnels / Geotechnics: 43 - Bsa: 3 - External Objects: 6
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e713dd71-5c63-4aba-bcc0-fca3b65d26bd.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.