GTR 117332857

Quotation Are Invited For Refurbishment Top Ceiling Cover For Hrg 84 Fwp A Enclosure & (Repair And Refurbishment Front Door For Hrg Fwp Encloser) At L 2 Station (Mst)

ICB — International Competitive Bid Closes Aug 27, 2026 — 1 days left Asia
Tender Information
GTR Reference
117332857
Tendering Authority
Subscribe to view
Tender No
2332602057
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Refurbishment Top Ceiling Cover For Hrg 84 Fwp A Enclosure & (Repair And Refurbishment Front Door For Hrg Fwp Encloser) At L 2 Station (Mst)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
27-08-2026 1 days left
Work Detail
Quotation are invited for 1032603951 Refurbishment Top Ceiling Cover for HRG 84 FWP a Enclosure & (Repair and Refurbishment Front Door for HRG FWP Encloser) at L 2 Station (MST) 1 ITEM-00001 REFURBISHMENT TOP CEILING COVER FOR HRG 84 FWP A ENCLOSURE AT L 2STATION (MST)SCOPE OF WORK:· SITE SURVEY REQUIRED· REMOVE (8 DAMAGE D SHEETS OF TOP CEILING COVER & OUTSIDE ELBOW TYPE(SILENCER) FOR EXHAUST FAN) FOR HRSG 84 FWP A ENCLOSURE.· FABRICATE & INSTALL THE REQUIRED MATERIAL FOR (CEILING TOP COVER&& OUTSIDE ELBOW TYPE (SILENCER) FOR EXHAUST FAN)· THE NEW SHEETS SHOULD HAVE THE SAME DIMEN SIONS, PACKING & PAINTING OFEXISTING SHEETS.· ANY ADDITIONAL WORK FOR TOP CEILING COVER ENCLOSURE MUST BE CARRIEDOUT TO COMPLETE THE JOB& REFURBISHMENT TOP CEILING COVER· HOUSEKEEPING TO BE CONDUCTED AFTER COMPLETION OF WORK.· WARRANTY 1 YEAR FROM DATE OF SIGN JOB COMPLETION REPORT AGAINST ANYDEFECT.· WORK CARRIES OUT ACCORDING TO DEWA OPERATION CLEARANCE TO START THEJOB.FOR 1 EA QUERIES WRITE TO M [email protected] 2 ITEM-00002 REPAIR & REFURBISHMENT FRONT DOOR FOR HRG FWP ENCLOSER#(8 NOS)SCOPE OF WORK:-#INSTALL RUBBER DOOR SEALING-#DOOR LOCK REPLACED BY NEW THE SAME ASSEMBLY SAMPLE-#PAINTING REQUIRED BY THE SAME COLOR-#ANY ADDITIONAL WORK MUST BE CARRIED OUT TO REFURBISH THE DOOR-#WARRA NTY 1 YEAR FROM DATE OF SIGN JOB COMPLETION REPORT AGAINST ANYDEFECT.-#WORK CARRIES OUT ACCORDING TO DEWA OPERATION CLEARANCE TO STA RT THEJOB. 8 EA SPECIAL NOTES / INSTRUCTIONS: Refurbishment top ceiling cover for HRG 84 FWP A enclosure & (Repair and Refurbishment Front door for HRG FWP Encloser) at L 2 station (MST) STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332602057)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a64ba425-55e5-446e-9cce-7cf5973862a8.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders