GTR 117295038

Corrigendum - Quotation Are Invited For Estation Ph1 Primary Nozzle, Secondary Nozzle And Liner Refurbishment

ICB — International Competitive Bid Asia
Tender Information
GTR Reference
117295038
Tendering Authority
Subscribe to view
Tender No
2412601382
Financer Name
Self-Funded
Work Title
Corrigendum - Quotation Are Invited For Estation Ph1 Primary Nozzle, Secondary Nozzle And Liner Refurbishment
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
25-08-2026
Work Detail
Quotation are invited for EStation PH1 Primary Nozzle, Secondary Nozzle and Liner Refurbishment. 1PCS PRIMARY NOZZLE REFURBISHMENTA.1. 9E FUEL NOZZLES - PRIMARYA.1.1. INSPECTION ONLY# RECEIVE, UNBOX AND VISUALLY INSPECT TO ASSESS OVERALL INCOMINGCONDITION OF PRIMARY FUELNOZZLES.# RECORD DRAWING AND SERIAL NUMBERS AND RECORD OF PREVIOUS REPAIRS, IFVISIBLE/LEGI BLE# PERFORM INCOMING FLOW TEST, IF APPLICABLE.# DISASSEMBLE FUEL NOZZLE ASSEMBLIES TO COMPONENT LEVEL.# DISASSEMBLE FUEL DISTRIBUTI ON VALVE (FDV); CLEAN, INSPECT, ASSEMBLE,AND PRESSURE TESTFDV.# CHEM-CLEAN END COVER TO REMOVE TYPICAL DEPOSITS (IF REQUIRED).# CLEA N COMPONENTS (GAS TIPS, DOG BONES, TUBING)# PERFORM VISUAL INSPECTIONS OF GAS TIPS (REVIEW COLLAR CONDITION -MEASURE PER REPAIRENGIN EERING INSTRUCTIONS, THREAD CONDITION, VANE CONDITION, OVERALLGENERAL CONDITION),PERFORM RED DYE INSPECTION OF END COVER (ALL WELDS AND MANIFOLD RINGSINSPECTED)# FLOW TEST COMPONENTS (GAS TIPS AND DOG BONES)# PERFORM ENGINEERING REVIEW OF PFN INSPECTION RESULTS AND ISSUEINSPECTION / CONDITIONREPORTA.1.2. LIGHT REPAIR# REPLACE C-SEALS, GASKETS, LOCK RINGS/PLATES.# ASSEMBLE COMPONENTS.# FLOW-TEST GAS PASSAGES/ADJUST.# FLOW-TEST ATOMIZING AIR/ADJUST.# FLOW TEST WATER AND OIL PASSAGES/ADJUST, AS APPLICABLE.# TORQUE CHECK/LEAK CH ECK ALL COVERS.# TACK WELD AND STAKE LOCK PLATES.# FINAL QUALITY CHECKS (VISUAL INSPECTION OF GENERAL CONDITION OFPARTS, FINAL BORES COPE OFINTERNAL PASSAGES)# PREPARE AND ISSUE FINAL REPORT INCLUDING FINAL FLOW MEASUREMENTS.# PACK IN RECEIVED BOXES AND PREPARE FOR RETURN SHIPMENT.A.1.3. MEDIUM REPAIR# # REPAIR UP TO 50% OF GAS TIP COLLARS THAT WERE IDENTIFIED ASFAILING THE MEASUREMENT ANDVISUA L INSPECTIONS.# REMOVE LOCK TABS ON UP TO 50% OF GAS TIPS THAT WERE IDENTIFIED ASFAILING THE VISUALINSPECTIONS.# CARRY OUT LAPPING O N THE C SEAL SEATING SURFACE.# REPLACE C-SEALS, GASKETS, LOCK RINGS/PLATES.# ASSEMBLE COMPONENTS.# FLOW-TEST GAS PASSAGES/ADJUST.# F LOW-TEST ATOMIZING AIR/ADJUST.# FLOW TEST WATER AND OIL PASSAGES/ADJUST, AS APPLICABLE.TORQUE CHECK/LEAK CHECK ALL COVERS.TACK WELD AND STAKE LOCK PLATES.# FINAL QUALITY CHECKS (VISUAL INSPECTION OF GENERAL CONDITION OFPARTS, FINAL BORESCOPE OFINTERNAL PASSAGES)# PREPARE AND ISSUE FINAL REPORT INCLUDING FINAL FLOW MEASUREMENTS.# PACK IN RECEIVED BOXES AND PREPARE FOR RETURN SHIPMENT.A.1.4. HEA VY REPAIR# REPAIR GREATER THAN 50% OF GAS TIP COLLARS THAT WERE IDENTIFIED ASFAILING THE MEASUREMENTAND VISUAL INSPECTIONS.# REMOVE LOCK TABS ON GREATER THAN 50% OF GAS TIPS THAT WERE IDENTIFIEDAS FAILING THE VISUALINSPECTIONS.# CARRY OUT PRESSURE TEST ON END COVE RS & FDV, AS REQUIRED.# REPLACE C-SEALS, GASKETS, LOCK RINGS/PLATES.# ASSEMBLE COMPONENTS.# FLOW-TEST GAS PASSAGES/ADJUST.# FLOW-TES T ATOMIZING AIR/ADJUST.# FLOW TEST WATER AND OIL PASSAGES/ADJUST, AS APPLICABLE.# TORQUE CHECK/LEAK CHECK ALL COVERS.# TACK WELD AND STAKE LOCK PLATES.# FINAL QUALITY CHECKS (VISUAL INSPECTION OF GENERAL CONDITION OFPARTS, FINAL BORESCOPE OFINTERNAL PASSAGES)# PRE PARE AND ISSUE FINAL REPORT INCLUDING FINAL FLOW MEASUREMENTS.# PACK IN RECEIVED BOXES AND PREPARE FOR RETURN SHIPMENT.NOTE: END COVER INSERT REPLACEMENT; SUPPLY & REPLACEMENT OF ALL PARTSEXCEPT FOR C-SEAL, OSEAL 6 PORT VALUE KIT(600P378-01) & LOCK PLATES WILLCHAR GE AS EXTRA. FOR FURTHER DETAILS, PLEASE CONTACT ASM MYNUDDIN(0503620814) Qty: 1 EStation PH1 Primary Nozzle, Secondary Nozzle and Liner Refurbishment kindly for Adirect enquiry for Further Details, Please Contact ASM MYNUDDIN (0503620814)[email protected] /MARWAN AL MHEIRI (0501136322) ([email protected]), AHMED ZAKARIA ( [email protected]), 0524781810 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412601382)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
022371aa-0433-4200-b38e-b82602c74c43.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders