GTR 117205270
Tenders Are Invited For Electricity, Heating, Solar And Nuclear Energy - Construction Of A Hydrogen Energy Storage With A Capacity Of 3 Mwh As Part Of The Investment Project Entitled Investment Activities In The Field Of Construction Of The Infrastructure Of The Energy Cluster Of The Municipalities Of Odolanów, Przygodzice, Sulmierzyce As Part Of Investment B2.2.2/G1.1.2 Of The National Reconstruction And Resilience Plan (Kpo): Res Installations Implemented By Energy Communities Part B: Support Investment Energy Services.
ICB — International Competitive Bid
Closes Sep 14, 2026
central europe
Tender Information
GTR Reference
117205270
Tendering Authority
Subscribe to view
Tender No
570823-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Electricity, Heating, Solar And Nuclear Energy - Construction Of A Hydrogen Energy Storage With A Capacity Of 3 Mwh As Part Of The Investment Project Entitled Investment Activities In The Field Of Construction Of The Infrastructure Of The Energy Cluster Of The Municipalities Of Odolanów, Przygodzice, Sulmierzyce As Part Of Investment B2.2.2/G1.1.2 Of The National Reconstruction And Resilience Plan (Kpo): Res Installations Implemented By Energy Communities Part B: Support Investment Energy Services.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
14-09-2026
Work Detail
Electricity, Heating, Solar And Nuclear Energy - Construction Of A Hydrogen Energy Storage With A Capacity Of 3 Mwh As Part Of The Investment Project Entitled Investment Activities In The Field Of Construction Of The Infrastructure Of The Energy Cluster Of The Municipalities Of Odolanów, Przygodzice, Sulmierzyce As Part Of Investment B2.2.2/G1.1.2 Of The National Reconstruction And Resilience Plan (Kpo): Res Installations Implemented By Energy Communities Part B: Support Investment Energy Services.. 1) The Subject Of The Order Is The Design, Delivery, Assembly, Integration And Commissioning Of A Demonstration Energy Storage Installation Using Hydrogen Technology As Part Of The Design And Build System - 1 Hydrogen Installation For Storing Energy From Renewable Energy Sources, Hereinafter Referred To As Installations. 2) The Ordering Party Does Not Divide The Order Into Parts. 3) The Scope Of The Order Includes In Particular: 1) Agreeing The Location Of The Devices With The Users, 2) Preparing Design Documentation, 3) Obtaining The Required Approvals And Notifications, 4) Securing The Work Site, 5) Delivery Of Devices And Materials, 6) Carrying Out The Works In Accordance With Occupational Health And Safety And Fire Protection Regulations, 7) Installation Of An Energy Storage Facility, 8) Execution Of Electrical Installations And Security Measures, 9) Execution Of Ground Assembly Structures, 10) Commissioning Of The Installation, 11) Carrying Out Tests And Measurements, 12) Tidying Up The Area After Completion Of The Work, 13) Training Users, 14) Providing As-Built Documentation, Electrical Diagrams, Measurement Protocols, User Manuals, Catalog Cards, Declarations Of Conformity, Warranty Cards, 15) Implementation Of An Energy Management System. 16) Providing Warranty Service. 4) The Installation Is Designed To Produce Hydrogen Exclusively From Electricity From Renewable Energy Sources (Res), Collect It And Then Convert It Back Into Electricity, Enabling The Demonstration And Operation Of The System In Real Conditions. The System Is To Be Mobile And Consist Of A Hydrogen Production Module, A Compression Module With A Buffer, A Fuel Cell, And A Fuel Storage Module. 5) The Purpose Of The Order Is To Create A Fully Functional Pilot Installation, Enabling A Practical Assessment Of The Operation Of The Hydrogen Energy Storage System, Verification Of Its Technical Parameters And Analysis Of The Effectiveness Of Integration Of Hydrogen Technologies With The Local Energy Infrastructure. The Order Will Be Carried Out On A Turnkey Basis And Covers All Work Necessary To Achieve Full Operational Readiness Of The Installation, Including Assembly, Commissioning, Functional Tests And Submission Of Complete Technical Documentation. The Planned Scope Of Works Will Not Pose Any Threat To The Environment And Will Not Be Classified As A Project That May Have A Negative Impact On The Natural Environment. The Offer Prepared By The Contractor Should Be In Full Compliance With The Provisions Of The Fup And Include All Necessary Supplies, Services And Works Necessary For The Proper Implementation Of The Investment, Including Any Maintenance Activities Required To Ensure Proper, Reliable And Failure-Free Operation During The Warranty Period. The Users Of The Created Installation Will Be Employees And People Using The Services Of Public Buildings Covered By The Project. The Ordering Party Has A Legal Title Enabling It To Dispose Of The Real Estate Where The Investment Is Planned To Be Implemented. 6) As Part Of The Execution Of The Order, The Contractor Z.O
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f17a2a24-c942-43a7-b068-2f989853086b.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.