GTR 117146143
Request For Quotation Purchasing Spare Parts
ICB — International Competitive Bid
Closed
Central Asia
Tender Information
GTR Reference
117146143
Tendering Authority
Subscribe to view
Tender No
17499714
Financer Name
Self-Funded
Work Title
Request For Quotation Purchasing Spare Parts
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
21-08-2026
Closed
Work Detail
Hand/Gun Sprayer; Brass/Stainless Steel; Pressure Up To 40 Mpa; Adjustable Jet (Fan/Point); Chemical Resistance Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, 24V; Indication Of Oil Pressure, Coolant Temperature, Fuel; Analog-Digital Scale; Vibration Resistance; Scale Illumination Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Hydraulic Motor Working Volume: 160 ± 10 Cm³ Pressure: Not Less Than 20 Mpa Torque: Not Less Than 350 N•M Efficiency: No Less Than 87% Mandatory Requirement: Stable Operation At Low Speeds Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70, Mp-7 And Mtz-82.1 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Water Pump Capacity: No Less Than 180 L/Min Bearing Life: At Least 3000 Operating Hours Mandatory Requirement: Double Seal Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70, Mp-7 And Mtz-82.1 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Car Headlights Low And High Beam; Supply Voltage 12/24V; Lamp Type - Halogen Or Led; Sealed Housing, Degree Of Protection Ip54–Ip65; Resistance To Vibration And Shock Loads; Metal Reflector With Anti-Corrosion Coating; Impact-Resistant Polycarbonate Diffuser; Operating Temperature −40…+60°C Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mtz-82 Equipment, Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of Mtz-82.1 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier
Key Value
Tender Value
280,172 - KZT
Tender Documents
Global Tender Document
e388c89c-3ee4-4ab6-9fd5-824aebdb7d77.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.