GTR 117115036
Tenders Are Invited For Reconstruction Of Sports Infrastructure At Ul. Ludowa In Lubań
ICB — International Competitive Bid
Closes Sep 03, 2026
central europe
Tender Information
GTR Reference
117115036
Tendering Authority
Subscribe to view
Tender No
ZP.271.16.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of Sports Infrastructure At Ul. Ludowa In Lubań
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
03-09-2026
Work Detail
1. The Subject Of The Order Is The Implementation Of A Task Co-Financed By The Fund For The Development Of Physical Culture Entitled: Reconstruction Of Sports Infrastructure At Ludowa Street In Lubań.2. The Scope Of Work Will Include: A) Disassembly And Disposal Of The Existing Artificial Grass Surface Along With The Backfill, B) Disassembly And Assembly Of Goals, C) The Existing Surface Should Be Leveled And Prepared For Laying The Artificial Grass Surface With Stone Fines 0-5 Mm D) Laying A New Artificial Grass Surface And Constructing The Lines Of The Football Pitch, E) Installation Of An Information Board, F) Supervision/Performance Of Post-Construction Tests In Accordance With The Frkf Guidelines Characteristic Parameters Assumed To Be Obtained: Parameters Of Evenness And Geometry Of The Substrate Local Tolerance: The Maximum Clearance Under A 3-Meter Patch Placed In Any Place And Direction Is: ≤ 6 Mm. Surface Slopes: A Pitch With Artificial Grass Must Have Profiled Slopes (Envelope Or Roof) Ranging From 0.2% To 0.5%. A New Pitch Should Be Made Of Green Synthetic Grass, Filled With Quartz Sand And Recycled Epdm In Accordance With The Test Report. Tufted Synthetic Grass With Features As Close As Possible To Natural Grass In Terms Of Visual And Usability.3. One Of The Five Artificial Grass Surfaces With Parameters Described In The Opz Will Be Allowed For Installation. Surface Area Of The Pitch: 7,260 M2. Note: In The Valuation Of The Works, The Contractor Is To Include The Removal And Disposal Of All Waste Generated As A Result Of The Works And Demolitions. All Lengths And Areas Are Approximate Quantities And Are Subject To Verification By The Contractor In The Field. All Lines Must Be Made In Accordance With The Current Guidelines Contained In The Wa And Pzla For The Duration Of The Investment. After The Installation Of The New One Is Completed The Surface Should Be Tested In Accordance With The Frkf Guidelines. 4. The Detailed Scope Of The Order Is Included In The Technical Documentation Constituting Annex No. 5 To The Swz, Which Consists Of: 1) Description Of The Subject Of The Order (Opz), 2) Technical Specifications For The Execution And Acceptance Of Construction Works 3) Bill Of Quantities 4) Obligations And Good Practices In The Field Of Post-Construction Tests For Artificial Grass Pitches.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
748d9081-9385-4ad8-9405-c1c357f00cad.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.