GTR 117044544
Prior Information Notice For Construction Work – Ve9309
ICB — International Competitive Bid
Closes Oct 18, 2026
Western Europe
Tender Information
GTR Reference
117044544
Tendering Authority
Subscribe to view
Tender No
566262-2026
Financer Name
Self-Funded
Work Title
Prior Information Notice For Construction Work – Ve9309
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
18-10-2026
Work Detail
Prior Information Notice For Construction Work – Ve9309. To Expand Passenger Handling Capacity, Terminal 3 Was Built And Put Into Operation At Frankfurt Main Airport In Addition To The Existing Buildings In The North, Terminals 1 And 2, On The Site Of The Former Us Airbase (Today Cargocity Süd). The Background Is The Planned Move Of A Growing Airline To Terminal 3 For The Expected Summer Flight Schedule Sfp 2027, Which Will Create Additional Baggage Volume In Terminal 3. This Requirement Involves Structural Measures Such As Demolition, Conversion And New Construction Work In The Baggage Handling Systems In Buildings 601 And 602 In The Main Terminal Building. Measure M7: Expansion Of The Two Reserved Baggage Claim Routes In Building 600, Level E01 (Arrival Baggage Claim Hall), As Well As Expansion Of The Two Reserved Drop-Off Points In The Building For Arrival Baggage And Creation Of The Two Transport Lines For Arrival Baggage (Connecting Routes E01-Eu1 Between The Arrival Baggage Drop-Off Points In Building 601, Level E01, And The Baggage Claim Routes In Building 600, Level E01). In Order To Implement The Measure, It Is Necessary To Make 5 Ceiling Breakthroughs (3 In Building 600 And 2 In Building 601) Through Structural Adjustments. This Results In The Following Construction Measures: • Demolition And Disposal Of Floor Coverings Of Various Types, In Particular Natural Stone Including Expansion Joint Profiles, Heating Screed And Foam Glass, Approx. 1,600 Square Meters • Production Of Openings In Stb Ceilings, Approx. 5 Pieces • Closure Of Stb Ceilings, Including Existing Openings, Approx. 10 Pieces • Draining Of Underfloor Heating, Probably Approx Peripheral Areas: Floor Coverings, Screed, Painter) Measure M10: Measure M10 Includes The Implementation Of The Fourth Transfer Baggage Check-In Including An Additional X-Ray Control Device. This Results In The Following Construction Measures: • Temporary Fall Protection Measures • Dismantling The Impact Protection 1 Piece. • Floor Marking Work Around The Transfer Baggage Claim Start Of Service: April 2027 (Sending Order Letter) Start Of Assembly/Execution: Q3 2027 End Of Service (Including Subsequent Remaining Services And Acceptance): Q2 2028
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b0904af4-6097-4b74-8863-f6572e719c75.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.