GTR 116935375
Tenders Are Invited For Construction Of A Fire Alarm System In The Central Firefighting Museum In Mysłowice
ICB — International Competitive Bid
Closes Sep 02, 2026
central europe
Tender Information
GTR Reference
116935375
Tendering Authority
Subscribe to view
Tender No
WT.2370.3.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Fire Alarm System In The Central Firefighting Museum In Mysłowice
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
02-09-2026
Work Detail
1. The Subject Of The Order Is The Comprehensive Implementation Of The Investment Task Titled: Construction Of A Fire Alarm System In The Central Museum Of Firefighting In Mysłowice, In The Design And Build Formula1) The Order Includes The Design And Construction Of A Complete, Addressable Fire Alarm System, Hereinafter Referred To As Ssp, Intended To Ensure Full Protection Of The Complex Of Halls No. 1, 2, 3, 4 And 5 Of The Central Museum Of Firefighting In Mysłowice.2) The Completed Ssp Is To Be Complete, Operational, Configured, Launched, Tested, Documented And Ready For Use.3) The Contractor Is Responsible For Achieving The Required Functional Effect, In Particular For: A) Analysis Of The Ordering Partys Documents; B) Conducting An Inventory; C) Selection Of A Technical Solution; D) Development Of Complete Design Documentation; E) Obtaining The Required Administrative Arrangements And Decisions; F) Delivery Of Equipment And Materials; G) Performance Of Installation And Reconstruction Works; H) Configuration And Commissioning Of The Ssp;I) Execution Trials, Measurements And Tests;J) Development Of As-Built Documentation;K) Staff Training;L) Ensuring Warranty, Maintenance And Warranty Service.4) The Detailed Number, Type And Arrangement Of Devices, Cable Routes, Number Of Surveillance Loops, System Architecture, Alarm Method And Type Of Detection Will Be Determined By The Contractor In The Design Documentation.5) The Contractor Will Include In The Price All Reasonably Foreseeable Devices, Materials, Works, Services, Licenses, Software, Arrangements, Tests And Activities Necessary To Complete The Complete Ssp, Resulting From: A) Pfu; B) Documents Provided By The Ordering Party; C) Mandatory On-Site Visit; D) Legal Provisions; E) Principles Of Technical Knowledge; F) Relevant Standards; G) Manufacturers Documentation; H) Arrangements With A Fire Protection Expert.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
fdf45dbc-3fdf-42f2-8376-70118377e972.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.