Tenders Are Invited For Construction Of A Water Distribution Network In Bzianka, Part 2
ICB — International Competitive Bid
Closes Aug 26, 2026
— 2 days left
central europe
Tender Information
GTR Reference
116891809
Tendering Authority
Subscribe to view
Tender No
RIN.271.1.8.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Water Distribution Network In Bzianka, Part 2
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
26-08-2026
2 days left
Work Detail
1. Subject Of The Order: Scope: The Water Supply Network Is To Be Made Of Pipes, Ø110, Ø90, 63, 40 Mm. A Technical And Technological Solution Has Been Designed To Minimize The Risk Of Emergency Situations. The Foundation Of The Water Pipeline Should Meet The Conditions Applicable To Pipelines Made Of Pe. Pe 100Rc Pipes Should Be Used In Accordance With The Pas 1075 Standard, Which Do Not Require The Use Of Sand Bedding And Are Laid In The Ground Using Traditional And Narrow Trench Methods. Pipelines Should Be Laid In Accordance With Longitudinal Profiles, At The Minimum Depth Specified In The Standards. The Route Of The Underground Water Supply Network Should Be Marked With A Pvc Foil Tape With A Metallic Insert At A Depth Of 70 Cm Below The Ground. The Constructed Water Supply Network Will Be Equipped With Mains And Junction Gate Valves, As Well As Above-Ground Fire Hydrants With Shut-Off Valves. Regulation And Measurement Chambers Should Be Constructed In The Water Supply Network. The Scope Of Work Includes The Construction Of A Water Supply Network And The Protection Of Existing Underground Utilities Intersecting With The Planned Network. The Detailed Scope Of Work Is Presented In The Design Documentation, Subsoil Documentation, Technical Specifications And Bill Of Quantities. Please Note That The Valuation Should Include The Section Of The Water Distribution Network From Point Ha 29 To Ha 66 Along With Profile A Branches. The Water Supply Network Should Be Constructed In Accordance With The Attached Construction Design, The Technical Specification For The Execution And Acceptance Of Construction Works And The Arrangements With The Supervision Inspector And The Employer.2. The Contractor Is Obliged To Include In The Offer Price All Works, Materials, Devices, Equipment And Other Activities Necessary For The Correct And Complete Execution Of The Scope Of Works In Question, In Accordance With The Design Documentation And The Employers Requirements. The Subject Of The Order Should Be Performed In Accordance With The Design Documentation - Annex No. 7 To The Swz: (In Connection With The Lump-Sum Settlement, The Submitted Bills Of Quantities Are Only Of Auxiliary Nature And Do Not Constitute The Basis For The Offer Valuation). - Principles Of Technical Knowledge, Currently Applicable Law Construction Together With Implementing Acts And Occupational Health And Safety Regulations.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
43cc8a24-d7bd-4e4c-8fea-9b54b4ce7dd0.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.