GTR 116879774

Tenders Are Invited For Renovation Of Rooms In The A22 Building, Including The Installation Of Air Conditioning Systems And The Installation Of Mobile Shelves In The Archive Rooms Of The Lodz University Of Technology In The Design And Build Formula

ICB — International Competitive Bid Closes Aug 28, 2026 — 5 days left central europe
Tender Information
GTR Reference
116879774
Tendering Authority
Subscribe to view
Tender No
RAP.262.21.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of Rooms In The A22 Building, Including The Installation Of Air Conditioning Systems And The Installation Of Mobile Shelves In The Archive Rooms Of The Lodz University Of Technology In The Design And Build Formula
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
28-08-2026 5 days left
Work Detail
The Subject Of This Order Is The Design And Execution Of Construction Works Consisting In The Renovation Of Rooms Located In The Basement, On The Ground Floor, 2Nd, 3Rd And 4Th Floor Of The A22 Building, Together With The Installation Of Air Conditioning Systems And Mobile Shelves In The Archive Rooms, Along With The Preparation Of Complete Design Documentation (Construction Design And Technical Design) And As-Built Documentation. The Description Of The Subject Of The Order Is Specified In: Functional And Utility Program (Ffu) - Annex No. A To Swz; Contract Template - Annex No. 4 To Swz. The Order Must Be Completed Within 11 Months From The Date Of Conclusion Of The Contract, Provided That The Design Documentation Within 4 Months From The Date Of Conclusion Of The Contract. The Ordering Party Will Consider That The Order Has Been Completed On Time If The Partial Acceptance Report For The Design Documentation And The Final Acceptance Report For The Subject Of The Order Are Signed By The Expiry Of The Above-Mentioned Period. Deadlines. The Duration Of The Design Documentation Acceptance Activity Is Included In The Deadline For Completing The Design Documentation. The Duration Of The Final Acceptance Activity Is Included In The Deadline For Completing The Implementation Of The Subject Of The Order.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
069e6638-2e7c-474e-9fc9-fc659b0b1331.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders