GTR 116833491

Quotation Are Invited For Remote Desktop Protocol (Rdp) Connectivity Assessment, Design, Security Validation And Implementation

ICB — International Competitive Bid Closed Asia
Tender Information
GTR Reference
116833491
Tendering Authority
Subscribe to view
Tender No
2412601361
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Remote Desktop Protocol (Rdp) Connectivity Assessment, Design, Security Validation And Implementation
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
14-08-2026 Closed
Work Detail
Quotation are invited for Remote Desktop Protocol (RDP) Connectivity Assessment, Design, Security Validation and Implementation. TENDER TECHNICAL SPECIFICATIONREMOTE DESKTOP PROTOCOL (RDP) CONNECTIVITY ASSESSMENT, DESIGN, SECURITYVALIDATION AND IMPLEMENTATION . SCOPE OF WORKTHE OBJECTIVE OF THIS PROJECT IS TO ASSESS, REVIEW, DESIGN, VALIDATESECURITY, AND PLAN THE IMPLEMENTATION OF SECURE REM OTE DESKTOP PROTOCOL(RDP) CONNECTIVITY FROM THE AL QOUZ SUSTAINABLE BUILDING GROUND FLOOR TOTHE BMC BUILDING- AL RUWAYYAH SECURITY O PERATIONS CENTRE (SOC). THE WORKENCOMPASSES THE EVALUATION AND CONFIGURATION OF NETWORK INFRASTRUCTURE,INCLUDING SWITCHES AND FIREWA LLS, TO ENSURE SECURE AND RELIABLECONNECTIVITY.SYSTEMS IN SCOPE·#CMS SERVER AND WORKSTATIONS·#REMOTE MAINTENANCE SYSTEM FOR THE AL Y ASAT RO PLANT1. INFRASTRUCTURE AND SECURITY REVIEW·#REVIEW THE EXISTING NETWORK, FIREWALL, AND SECURITY POLICIES TOIDENTIFY ANY GAPS OR IMPROVEMENTS REQUIRED FOR SECURE RDP CONNECTIVITY.·#ASSESS THE CONNECTIVITY REQUIREMENTS BETWEEN ENDPOINTS, THE CORENETWORK, AND RACK INFRASTRUCTURE TO ENSURE SEAMLESS COMMUNICATION.·#REVIEW VLAN CONFIGURATION AND THE ASSOCIATED NETWORK SEGMENTATION TOMAINTAIN SECURITY AND EFFICIENCY.·#VALIDATE THE SWITCH CONFIGURATIONS THAT ARE RELEVANT TO THE PROPOSEDIMPLEMENTATION, ENSURING COMPATIBILIT Y WITH THE PROJECT OBJECTIVES.2. NETWORK AND ROUTING ASSESSMENT·#REVIEW IP ADDRESSING REQUIREMENTS TO FACILITATE PROPER NETWORKCOMMU NICATION AND MANAGEMENT.·#VALIDATE GATEWAY AND ROUTING CONFIGURATIONS TO GUARANTEE CORRECT DATAFLOW WITHIN THE NETWORK.·#ASSESS THE CONNECTIVITY PATHS NECESSARY FOR SECURERDP ACCESS,ENSURING ALL LINKS ARE ROBUST AND SECURE.·#VERIFY NETWORK ADDRESS TRANSLATION (NA T) AND ROUTING DEPENDENCIESWHERE APPLICABLE TO SUPPORT SEAMLESS REMOTE ACCESS.3. FIREWALL REVIEW AND CONFIGURATION PLANNING·#REVIEW FIREWALL POLICIES FOR BOTH CHECK POINT AND FORTINET FIREWALLSTO CONFIRM THEY MEET THE SECURITY REQUIREMENTS FOR RDP CONNECTIVITY.·#V ALIDATE TRAFFIC FLOW AND REQUIRED ACCESS RULES TO ENSURE SECURE ANDUNINTERRUPTED REMOTE DESKTOP SESSIONS.·#REVIEW AUTHENTICATION REQ UIREMENTS ACROSS ALL SECURITY LAYERS TOMAINTAIN A STRONG SECURITY POSTURE.·#IDENTIFY SECURITY DEPENDENCIES THAT MAY IMPACT REMOTE AC CESS ANDADDRESS THEM AS PART OF THE IMPLEMENTATION.4. SECURITY INTEGRATION ASSESSMENT·#REVIEW EXISTING AUTHENTICATION AND AUTHORIZAT ION MECHANISMS TO ENSURETHEY ARE ROBUST AND SUITABLE FOR THE PLANNED RDP DEPLOYMENT.·#VALIDATE INTEGRATION REQUIREMENTS FOR CRITICAL SECURITY CONTROLS,INCLUDING:·#MULTI-FACTOR AUTHENTICATION (MFA)·#PRIVILEGED ACCESS MANAGEMENT (PAM)·#ACTIVE DIRECTORY / LDAP AUTHEN TICATION·#OTHER APPLICABLE SECURITY CONTROLS5. ONSITE ASSESSMENT AND VALIDATION·#CONDUCT AN ONSITE REVIEW AND VALIDATION OF THE ENVI RONMENT TO VERIFYTHE EXISTING SETUP AND IDENTIFY ANY GAPS.·#CONFIRM THAT ALL PREREQUISITES FOR IMPLEMENTATION ARE MET BEFOREPROCEEDI NG WITH THE DEPLOYMENT.·#IDENTIFY ANY ADDITIONAL TECHNICAL REQUIREMENTS OR CONSTRAINTS THATMAY AFFECT THE PROJECT.·#PROVIDE RECOMMEN DATIONS AND IMPLEMENTATION GUIDANCE TO ENSURE ASUCCESSFUL ROLLOUT.6. DOCUMENTATION AND IMPLEMENTATION PLAN·#DELIVER DETAILED IMPLEME NTATION RECOMMENDATIONS BASED ON THEASSESSMENT FINDINGS.·#PROVIDE COMPREHENSIVE CONFIGURATION AND CONNECTIVITY REQUIREMENTS FORTHE S ECURE RDP SOLUTION.·#SUBMIT A DEPLOYMENT APPROACH AND AN ACTIONABLE IMPLEMENTATION PLANFOR THE PROJECT.DELIVERABLES·#NETWORK AND SEC URITY ASSESSMENT FINDINGS REPORT·#FIREWALL AND CONNECTIVITY REVIEW REPORT·#CHECKLIST OF RDP IMPLEMENTATION PREREQUISITES·#DEPLOYMENT AND IMPLEMENTATION RECOMMENDATIONS·#TECHNICAL CONSULTATION SUPPORT DURING PLANNING ACTIVITIES Qty: 1 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412601361)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f4fe154b-57b4-4d46-bf70-c2d994fc68d6.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders