GTR 116793394
Tenders Are Invited For Renovation Of The Roof Covering, Roof Sheet Metal Work On A Laboratory And Administrative Building With An Area Of 500 M2, Along With A Rainwater Drainage System.
ICB — International Competitive Bid
Closes Aug 31, 2026
— 6 days left
central europe
Tender Information
GTR Reference
116793394
Tendering Authority
Subscribe to view
Tender No
RZP-427/2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of The Roof Covering, Roof Sheet Metal Work On A Laboratory And Administrative Building With An Area Of 500 M2, Along With A Rainwater Drainage System.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
31-08-2026
6 days left
Work Detail
1) Tearing Off The Existing Roof Covering With An Area Of 500 M2, 2) Repairing The Flat Roof, Repairing The Concrete Layer, Cleaning The Roof And, Depending On The Needs, Repairing The Surface; Additionally, He Will Impregnate The Substrate And Lay A Base Layer Of Roofing Felt, 3) Remove Sheet Metal Flashings That Are Not Suitable For Use, 4) Thermal Insulation Using Polystyrene With A Thickness Of Min. 12 Cm,5) Covering With Underlay Felt,6) Covering The Top Covering With Felt,7) Installation Of Vent Chimneys - 10 Pieces.8) New Eaves Board With A Total Length Of Approximately 84M,9) Sheet Metal Processing Of The Sloped Part Of The Roof With A Total Length Of 84M,10) Removal And Disposal Of Removed Roof Elements.11) The Contractor Provides An Obligatory Warranty, The Period Of Which Is 24 Months For Construction Works From The Date Of Acceptance Final Task. The Maximum Warranty Period For Construction Works Allowed By The Ordering Party Is 36 Months. The Period Of The Warranty Provided Is The Criterion For Evaluating The Offers In These Proceedings. 12) The Ordering Party Reserves The Right To Invalidate This Procedure Pursuant To Art. 310 Of The Public Procurement Law, If The Funds He Intended To Allocate For The Implementation Of The Order Are Not Granted To Him In Whole Or In Part. The Ordering Party Is Entitled To Invalidate The Proceedings With The Above-Mentioned. Premises At Each Stage. The Ordering Party Retains The Right To Cancel The Proceedings With The Above-Mentioned. Conditions Both When He Receives Clear Information That He Has Not Been Granted Funds For The Execution Of The Order, As Well As In The Event Of A Delay In Obtaining Them In Relation To The Assumed Deadline For Completing The Task, If The Lack Of Funds On Time Prevents The Execution Of The Order. The Contractor Does Not Have The Right To Request The Ordering Party To Take Actions Aimed At Obtaining Funds For The Implementation Of The Order If They Are Not Granted To Him From The Assumed Source. In The Event Of Invalidation Of The Proceedings Pursuant To Art. 310 Of The Public Procurement Law, Contractors Are Not Entitled To A Claim For Reimbursement Of Any Costs Of Participation In The Proceedings, Including In Particular Reimbursement Of The Costs Of Carrying Out An On-Site Visit, Costs Of Calculation And Preparation Of The Offer, And Which - By Participating In The Proceedings On The Terms Specified In This Documentation - The Contractors Accept Without Reservations.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2c997a29-0310-4a72-aa57-42473b93428e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.