GTR 116768424

Tenders Are Invited For Transformer Substation – Planning (From Lph 4 Hoai) And Construction Of A Substation (110 Kv Flsa And 10 Kv Ms Switchgear) In 46395 Bocholt

ICB — International Competitive Bid Closes Sep 18, 2026 Western Europe
Tender Information
GTR Reference
116768424
Tendering Authority
Subscribe to view
Tender No
551512-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Transformer Substation – Planning (From Lph 4 Hoai) And Construction Of A Substation (110 Kv Flsa And 10 Kv Ms Switchgear) In 46395 Bocholt
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
18-09-2026
Work Detail
Transformer Substation – Planning (From Lph 4 Hoai) And Construction Of A Substation (110 Kv Flsa And 10 Kv Ms Switchgear) In 46395 Bocholt. The Client Is A Modern Service Company That Operates The Electricity, Gas, Water And Fiber Optic Networks In Bocholt. The Client Is Also Responsible For The Local Heating Supply In The Urban Area. The Client Sees Himself Exposed To New Challenges In The Urban Context. Due To The Extensive Expansion Of The Electrical Systems, The Client Plans To Have A New Substation Built With Large Transformers, Which Is Connected To A 110 Kv Cable Route Across The Bocholt Urban Area. The Contractor Should Build The Substation On Land Owned By The Client. The Substation Should Include The Following Facilities And Rooms: - A 110 Kv Flsa Including Operations Building With A 10 Kv Ms Switchgear (Approx. 31 Fields), - A Room To Accommodate The Control Technology (Control Room For Protection, Control Cabinets, Metering), - Chargers, Eb Distributions (Ac & Dc), Etc., A Separate Room For The Battery System, - Two Rooms For E-Coils, - A Room For Telecommunications (Accessible From Outside) And Appropriate Sanitary Facilities As Well As - Three Equipment Rooms, - Fence System, - Foundations For The Transformers And For The 110 Kv Flsa. The New Substation Is To Be Connected To The 110 Kv Network Via A Double Branch Connection With H Circuit. A Complete Earthing System/Lightning Protection Must Be Built For The Substation. In Addition, Measurement After Construction Is Part Of The Contractors Scope. The Contractor Must Complete The Planning For All Parts Of The System (Draft Planning (Lph 3 Hoai) Is Available). He Then Has To Assemble The System Components And, In Coordination With The Client, Check That They Function As Intended And Put Them Into Operation. The Client Has Already Ordered The Large Transformers For The Substation. These Will Be Delivered At The End Of 2027. The Client Tendered The Civil Engineering Work For The Cable Route To Which The Contractor Is To Connect The Substation In A Separate Procurement Process. These Services Are Not The Subject Of The Tender. The System Must Be Completed By The Planned Delivery Date Of The Large Transformers, So That The Entire System Is Ready For Operation By The End Of 2027.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f1dc254f-cff8-430c-8946-c8c7f8fc9089.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders