GTR 116767730

Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – 2026-0475 Dike Renovation/Relocation Mündelheim, Elevation Of The B 288 - Inspection Engineering Services

ICB — International Competitive Bid Closes Sep 08, 2026 Western Europe
Tender Information
GTR Reference
116767730
Tendering Authority
Subscribe to view
Tender No
549574-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – 2026-0475 Dike Renovation/Relocation Mündelheim, Elevation Of The B 288 - Inspection Engineering Services
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
08-09-2026
Work Detail
Architectural, Construction, Engineering And Inspection Services – 2026-0475 Dike Renovation/Relocation Mündelheim, Elevation Of The B 288 - Inspection Engineering Services. The Services To Be Examined Relate To The Elevation Of The B 288. They Include The Reconstruction Work On The B 288 Between Mündelheim And The Krefeld-Uerdinger Bridge Over A Stretch Of Approx. 1,300 M In Length. These Are Essentially: - The Construction Of A New Bridge For The Elevation Of The B 288 (Bw 4606 646), - The Overpass Of The B 288 Over The Dike Defense Path (Bw 4606 510), - The Necessary Supporting Frames For The Construction Of The Bridge And Overpass, - A Rainwater Treatment Basin In The East Of The Elevation (Bw 4606 580 A), - A Rainwater Treatment Basin In The West Of The System (Bw 4606 504) And - Various Construction Measures, Including For The West Abutment, The Rainwater Treatment Basins And The Drainage Canals. The Bridge For The Elevation Of The B 288 Is A Continuous Beam In Prestressed Concrete Construction Over 15 Fields With A Total Length Of 558 M. The Overpass Of The B 288 Over The Dike Defense Path Is A Frame Structure With A Passage Length Of 18.50 M. Both Structures Are Founded On Bored Piles. Two Rainwater Settling Basins Are Part Of The Bridge Drainage And Street Drainage. A Bypass For Ongoing Traffic On The B 288 And Shoring Are Planned For The Construction Of The West Bridge Abutment. A Detailed Description Of The Services Can Be Found In The Tender Documents.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2e41590b-0577-4eb3-a0d1-c35596e8fb75.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders