GTR 116660876
Tenders Are Invited For Expansion Of The Water Supply Network, Sanitary Sewage Network And Relocation Of The Heat Pipeline Every Dn 50 In The Area Of Ul. 1-Go Maja In Brzeg Dolny
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
116660876
Tendering Authority
Subscribe to view
Tender No
ZP.271.31.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion Of The Water Supply Network, Sanitary Sewage Network And Relocation Of The Heat Pipeline Every Dn 50 In The Area Of Ul. 1-Go Maja In Brzeg Dolny
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
21-08-2026
Closed
Work Detail
The Subject Of The Order Is The Implementation Of The Following Investment: Expansion Of The Water Supply Network, Sanitary Sewage Network And Relocation Of The Heat Pipeline Every Dn 50 In The Area Of Ul. 1-Go Maja In Brzeg Dolny. The Basis For The Implementation Of The Subject Of The Order Is The Design Documentation Prepared By Environmental Engineer Tadeusz Żygadło, Ul. Jaworowa 22, 56-120 Brzeg Dolny, Constituting An Annex To The Swz. I. Construction Works Consist Of:1. Construction Of A Section Of The Water Supply Network In Plots No. 2477, 2478, 2479, 2480, 2491 In Order To Ensure The Supply Of Drinking Water To Adjacent Building Plots. The Water Supply Network Will Be Made Of A Pe De 110 Pipe With One Above-Ground Hydrant Installed On It, With A Pe De 50 Pipe Branch In Plot No. 2479, 2478 And A Pe De 63 Pipe Branch In Plot No. 2480.2. Construction Of A Sanitary Sewage System To Discharge Sewage From Adjacent Building Plots. Sanitary Sewage From Plots Adjacent To The Designed Network Will Be Discharged By Gravity To The Sewage Pumping Station Built In Plot No. 2493. Sanitary Sewage From Plots Adjacent To The Planned Sanitary Sewage System Will Be Discharged Through Intermediate Wells To The Newly Constructed Sewage Pumping Station As Part Of The Project. The Sewage Pumping Station Will Send Sanitary Sewage Through The Sr Expansion Well To The S3.3 Connection Well. Relocation Of The Heat Pipeline, 2 Pre-Insulated Pipes Dn 50 In Plot No. 2480, 2493.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
dd5b672b-835f-4a34-b416-f68bad3ad933.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.