GTR 116490219
Bids Are Invited For Rfp 26-1392 Ewcrws Infrastructure And Expansion - Trinity Well And Phase 1D Project Follow Solicitation
ICB — International Competitive Bid
Closes Nov 03, 2026
Northern America
Tender Information
GTR Reference
116490219
Tendering Authority
Subscribe to view
Tender No
26-1392
Financer Name
Self-Funded
Work Title
Bids Are Invited For Rfp 26-1392 Ewcrws Infrastructure And Expansion - Trinity Well And Phase 1D Project Follow Solicitation
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia-Pacific Economic Cooperation, APEC,APAC (Asia Pacific)
Last Date of Bid Submission
03-11-2026
Work Detail
RFP 26-1392 EWCRWS Infrastructure and Expansion - Trinity Well and Phase 1D Project Follow Solicitation .The Bra Is Soliciting Sealed Proposals For The Ewcrws Infrastructure And Expansionthe “1B1d Project” Represents Two Critical Expansion Improvements To The Brazos River Authority’S (Bra) East Williamson County’S Regional Water System Water Treatment Plant (Ewcwtp); Phase 1B And Phase 1D.The Phase 1B Trinity Well Infrastructure Improvements Will Use Cooling Towers To Treat Up To 4 Mgd Of Groundwater From The Existing Trinity Well #1 For Blending With Treated Surface Water From Granger Lake. Trinity Well #1 Is Located On The Campus Of The Ewcwtp. Additionally, Phase 1B Work Located At The Ewcwtp Includes Significant Chemical Monitoring And Distribution Systems, Stormwater System, Upgrades To Electrical And Automation, And Access Road Improvements That Provide Future Buildout Resilience. Phase 1B Has Schedule Priority.The Phase 1D Short-Term Expansion Continues Improvements At The Ewcwtp To Treat Up To 13 Mgd Of Additional Surface Water From Granger Lake By Expanding Raw Water Pumping Capacity, Upgrading Storage Reservoir Inlets, Outlets, And Pumping Capacity, Upgrades To Existing Chemical Systems, Upgrades To Electrical And Automation Systems, New Rapid Mix System, Two New Clarifiers, Modify Piping At Four Existing Filters, Four New Additional Filter Systems, New Backwash Basin Demolition Of Existing Components And Structures Being Replaced Or Removed, An Additional 4.25 Mg Of Finished Water Storage Capacity For Storage Of Blended Treated Groundwater (From Phase 1B) With Treated Surface Water (From Phase 1D), And Access Road Improvements. Phase 1D Also Includes A New Medium Service Pump Station For Transmission Of The Finished Water To The Bra’S Existing And Potential New Customers, While Providing Future Buildout Resilience For Longer Term Expansion.15500-Buildings And Structures: Fabricated And Prefabricated;90900-Building Construction Services, New (Incl. Maintenance And Repair Services);91148-C.I.P., Preconstruction Services;91177-Facilities And Other Improvements;91200-Construction Services, General (Incl. Maintenance And Repair Services);91238-Construction Services, Hazardous Waste (Incl. Site Management);91300-Construction Services, Heavy (Incl. Maintenance And Repair Services);91359-Construction And Upgrades, Wastewater Treatment Plant;91360-Construction, Water System/Plants, Main And Service Line;91391-Maintenance And Repair, Wastewater Treatment Plant;91400-Construction Services, Trade (New Construction);95108-Facilities And Other Improvements, Fences;95109-Facilities And Other Improvements;95115-Infrastructure And Infrastructure Improvements;
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
3613798c-a486-4c60-8382-064aa23d2c66.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.