GTR 116136089
Tenders Are Invited For Polluted Soil Removal Services – Framework Agreement For Soil Disposal And Operational Management Of Interim Storage Area
ICB — International Competitive Bid
Closes Aug 21, 2026
Western Europe
Tender Information
GTR Reference
116136089
Tendering Authority
Subscribe to view
Tender No
508995-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Polluted Soil Removal Services – Framework Agreement For Soil Disposal And Operational Management Of Interim Storage Area
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
21-08-2026
Work Detail
Polluted Soil Removal Services – Framework Agreement For Soil Disposal And Operational Management Of Interim Storage Area. The Work Will Be Awarded As A Framework Contract With A Term From January 1St, 2027 To December 31St, 2028. During Civil Engineering Work By Rewag, The Regensburg Civil Engineering Authority Or Third Parties, Excavated Soil And Asphalt Are Produced, Which Must Be Disposed Of Professionally. The Civil Engineering Companies Commissioned Deliver The Removed Material To The Interim Storage Area On Kremser Straße At Hs.Nr. 12, Regensburg. If The Construction Area Is Large Enough, Storage Will Be Carried Out In The Construction Area. Storage Takes Place In Separate Heaps (At Least One Heap Per Construction Project). Collection Points Are Set Up For Small Measures Such As House Connections And Disruptions. If Asphalt Is Broken Up, The Contractor Must Provide A Sufficient Number Of Containers On The Construction Site If A Quick Qualitative Test By The Clients Subcontractor Indicates Components Containing Pitch. The Interim Storage Area Is Managed By Rewag In Cooperation With The City Of Regensburg, Hereinafter Referred To As Ag. However, Operational Management Should Be Significantly Supported By The Contractor. If No Further Material Is Produced During A Construction Project Or If The Maximum Pile Size Of Around 500M³ Has Been Reached, The Client Will Notify The Sample Taker. Once The Analysis And Classification Have Been Completed, The Contractor Will Be Commissioned. Once The Analysis Has Been Submitted, The Relevant Waste Must Be Disposed Of From The Interim Storage Area Or The Construction Site Within 10 Working Days. The Travel Costs To The Construction Sites Or The Interim Storage Area Must Be Included In The Standard Prices. The Construction Sites Are Located In The City Of Regensburg And The Rewag Supply Area (See Appendix).
Key Value
Tender Value
4,000,000 - EUR
Tender Documents
Global Tender Document
abb4e588-1146-40e8-9aef-74366146a1bc.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.