GTR 116096023

Quotation Are Invited For Integrity Inspections Of Hrsg 21 At M Station, Jebel Ali

ICB — International Competitive Bid Closed Asia
Tender Information
GTR Reference
116096023
Tendering Authority
Subscribe to view
Tender No
2332601774
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Integrity Inspections Of Hrsg 21 At M Station, Jebel Ali
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
27-07-2026 Closed
Work Detail
Quotation are invited for Integrity Inspections of HRSG 21 at M Station, Jebel Ali Hrsg 21 & 31 Integrity Inspec 1032603302 1 ITEM-00001 INTEGRITY INSPECTIONS OF HRSG 21AT #M# STATION, JEBEL ALI1.#INTRODUCTION:1.1.#DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) IS THE OWN ER ANDOPERATOR OF 17,979 MW OF ELECTRICITY GENERATION AND 555.0 MIGD OFDESALINATED WATER PRODUCTION PLANTS AND OWNS AND OPERATES ALL TRANSMISSION AND DISTRIBUTION NETWORKS IN THE EMIRATES OF DUBAI.1.2.#DEWA GENERATE POWER USING NATURAL GAS (NG) AND / OR FUEL OILS ( DFOAND / OR MFO) DELIVERED TO EITHER BOILERS AND OR GAS TURBINES. P2STATIONS COMPRISE OF 16 HRSGS (HEAT RECOVERY STEAM GENERATORS/BO ILERS),16 GTS (GAS TURBINES), 7 AUX BOILERS AND 9 STEAM TURBINES.1.3.#GENERATION DIVISION OF DEWA OPERATES AND PROVIDES MAINTENANCE, REPAIR AND OVERHAUL SERVICES FOR POWER GENERATION AND WATER PRODUCTIONPLANTS IN DEWA. SAFETY, AVAILABILITY, RELIABILITY AND 1 AU COST HAV E ALWAYSBEEN THE MOST IMPORTANT PRIORITIES IN DEWA.1.4.#IN DEWA, M-STATION COMPRISES OF SIX HRSGS AND ALL ARE MANUFACTUREDBY M/S DOO SAN.1.5.#DEWA INTENDS TO APPOINT A COMPETENT BOILER OEM / BOILER INSPECTIONAGENCY HAVING A LEGAL STANDING AS PER LOCAL REGULATIONS, THE CAPABILITYAND EXTENSIVE PAST EXPERIENCE IN BOILER INTEGRITY ASSESSMENT TO CARRYOUT INTEGRITY ASSESSMENT OF HRSG 21 IN #M STATION # IN COMPLIANCE TO EIAC#RQ-1B-004, ASME BPVC SECTION I AND SECTION VIII BASED ON THE PREVIOUSINTEGRITY ASSESSMENT REPORT FROM THE YE AR NOV-2021 AND ITS RECOMMENDEDINSPECTION INTERVAL DURING THE FORTHCOMING OUTAGE OF HRSG 21 TENTATIVELYPLANNED DURING OCT-2026 TO AP R-20272.#PHYSICAL BOUNDARY SPECIAL NOTES / INSTRUCTIONS: HRSG 21 & 31 integrity inspection. [ For more details refer the attached scope of work ] Note : The bidder must be Boiler OEM and or registered / accredited boiler and pressure vessel inspection agency as per EIAC /Local Regulations and must be 25 year experienced in boiler integrity inspection, FFS, RL <(>&<)> NBIC certified. Contact : [email protected] / +971-4322-6179 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601774)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e41ebdef-1198-496d-8931-d81b8e7c03bf.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders