GTR 116096021
Quotation Are Invited For Comprehensive Annual Maintenance Of Air-Cooled Chillers
ICB — International Competitive Bid
Asia
Tender Information
GTR Reference
116096021
Tendering Authority
Subscribe to view
Tender No
2412601215
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Comprehensive Annual Maintenance Of Air-Cooled Chillers
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
27-07-2026
Work Detail
Quotation are invited for Comprehensive Annual Maintenance of Air-Cooled Chillers at Al Hudaibah CHC. COMPREHENSIVE ANNUAL MAINTENANCE OF AIR-COOLED CHILLERS AT AL HUDAIBAHCHC#INTRODUCTIONTHIS COMPREHENSIVE ANNUAL MAINTENANCE CONTRAC T (AMC) FOR THE CHILLERSYSTEM OUTLINES THE TERMS AND CONDITIONS FOR THE MAINTENANCE ANDSERVICING OF THE RELATED EQUIPMENT AND SYSTEM S. THIS AGREEMENT ISBETWEEN DUBAI ELECTRICITY AND WATER AUTHORITY (DEWA) AND SERVICEPROVIDERS.THE AMC ENSURES THAT SERVICES ARE PROV IDED THROUGHOUT THE ONE-YEARCONTRACT TERM, ENSURING THAT ALL EQUIPMENT AND SYSTEMS ARE REGULARLYMAINTAINED, MINIMIZING DOWNTIME, AND ACHIEVING OPTIMAL PERFORMANCE INLINE WITH DEWA#S OPERATIONAL AND SAFETY STANDARDS. THE CONTRACT COVERSPLANNED PREVENTIVE MAINTENANC E, CORRECTIVE MAINTENANCE, AND EMERGENCYRESPONSE AS REQUIRED, ENSURING THE RELIABLE AND EFFICIENT OPERATION OFTHE CHILLER SYSTEMS AC ROSS THE DESIGNATED DEWA FACILITIES.THROUGH THIS AMC, DEWA AIMS TO ENHANCE ASSET LIFE, IMPROVE ENERGYEFFICIENCY, AND MAINTAIN INDOOR ENVIRONMENTAL QUALITY TO SUPPORT THEAUTHORITY#S SUSTAINABILITY OBJECTIVES. THE SERVICE CONTRACTOR SHALLADHERE STRICTLY TO THE SCOPE , SCHEDULES, AND PERFORMANCE STANDARDSDEFINED IN THIS CONTRACT, ENSURING THAT ALL MAINTENANCE ACTIVITIES AREDOCUMENTED AND REPORTED FOR VERIFICATION AND COMPLIANCE.#SCOPE OF WORK1.#THE CONTRACTOR IS REQUIRED TO QUOTE THE LUMP SUM PRICE FORCOMPREHENSIVE ANNUAL MAIN TENANCE OF AIR-COOLED CHILLERS INCLUDINGOVERHAULING OF COMPRESSOR AND SPARE PARTS AS WELL.2.#THE QUOTATION WILL BE SUBMITTED AS PER DEWA SPECIFICATION AND SURVEYONLY.3.#THE CONTRACTOR TO PERFORM PPM ACTIVITIES AS PER THE BELOW DEWA CHECKLIST.4.#THE SPARE PARTS REQ UIRED BY THE CONTRACTOR TO CARRY OUT THERECTIFICATION ACTIVITY SHOULD BE ARRANGED AT THE EARLIEST & BEFORE THEACTIVITY STARTS ON THE EQUIPMENT.5.#IF THE CONTRACTOR SHOULD KEEP SPARE PARTS IN THE BUILDING TO KEEPTHE EQUIPMENT DOWN TIME TO MINIMUM, THE SPARE PARTS M UST BE KEPT IN APROPER PLACE & STORED CORRECTLY AND IN A PROPER PLACE WITHIN THEBUILDING PREMISES TO PREVENT ANY DAMAGE OR WARE OR E XPOSURE TO ANYELEMENT THAT CAN CAUSE A DAMAGE TO THE SPARE PART.DEWA-CONFIDENTIAL1.#THE SPARE PARTS PROVIDED BY THE CONTRACTOR MUST BE GENUINE SPARESFROM OEM OR OEM RECOMMENDED VENDORS AND APPROVED BY DEWA ENGINEERS.2.#DURING PPM ACTIVITIES CONTRACTOR TO PROVIDE SUFFICIENT MANPOWER TOCARRY OUT PREVENTIVE MAINTENANCE AND TO BE COMPLETED AS PER THE DEWASCHEDULE WITHOUT DELAY.3.#ALL THE MATERIALS THAT WILL BE PROVIDED BY THE CONTRACTOR FOR USE INANY ACTIVITY RELATED TO THIS AMC SCOPE OF WORK MUST BE CONFIRMED ANDAPPROVED PRIO R BY DEWA ENGINEERS AND AS PER THE LATEST STANDARDSAPPROVED AND IMPLEMENTED IN DEWA.4.#IT#S MANDATORY FOR THE CONTRACTOR WHO WILL AC CEPT & SIGN THIS AMCCONTRACT TO TAKE ALL PRECAUTIONS AND SAFETY MEASURES WHEN CARRYING OUTANY KIND OF ACTIVITY RELATED TO THIS AMC S COPE OF WORK.5.#IT#S MANDATORY FOR THE CONTRACTOR WHO WILL ACCEPT & SIGN THIS ANNUALMAINTENANCE CONTRACT TO CARRY OUT ANY ACTIVITY R ELATED TO THIS CONTRACTSCOPE OF WORK IN WAY THAT MUST NOT CAUSE ANY DAMAGE, FAILURE, WARE,BREAKDOWN AND MALFUNCTION TO ANY OF THE EX ISTING EQUIPMENT/ STRUCTURE ORANY PROPERTIES OF DEWA.6.#THE CONTRACTOR WHO ACCEPTS AND SIGNS THIS AMC MUST DEPLOY ANDPROVIDE KNOWLED GEABLE & PROFESSIONAL AC TECHNICIANS FOR CARRYING OUT THEMAINTENANCE WORK & ANY RELATED MAINTENANCE ACTIVITY TO THE EQUIPMENT.7.#ALL THE TECHNICAL PERSONALS PROVIDED BY THE CONTRACTOR WHO SIGNED &ACCEPTED THIS AMC SHALL BE APPROVED BY DEWA ENGINEERS RESPONSIBLE FO RTHE RELATED SCOPE OF WORK.8.#THE CONTRACTOR WHO ACCEPTS AND SIGNED THIS AMC MUST RESPONSE TO ANYEMERGENCY CALL OR BREAKDOWN CALL RE LATED TO ANY EQUIPMENT FALLING UNDERTHIS CONTRACT WITHIN 30 MINUTES AFTER THE RECEIPT OF THE NOTIFICATION ASPER THE TWO SLA CONDITIO NS MENTIONED IN THIS CONTRACT.9.#THE CONTRACTOR WHO ACCEPTS AND SIGNED THIS AMC MUST RECEIVEEMERGENCY CALLS FROM THE CLIENT 24/7 AND ALL THE YEAR ROUND TILL THEEXPIRY OF THIS AMC.10.#IF DEWA DECIDED TO RENEW THE ANNUAL MAINTENANCE CONTRACT WITH THESAME CONTRACTOR FOR THE NEXT YEAR, THE EXISTING CONTRACTOR MUST CONTINUETO FOLLOW THE TERMS MENTIONED IN THIS CONTRACT UNTIL THE NEW CONTRACT ISACCE PTED & SIGNED.11.#SHOULD WE EXPERIENCE A BREAKDOWN IN ANY OF THE EQUIPMENT/SYSTEM ATANY TIME OF THE DAY OR NIGHT, YOU WILL RESPOND T O OUR REQUEST WITH YOUR24 HOURS EMERGENCY CALL OUT SYSTEM AVAILABLE 7 DAYS A WEEK ALL YEARROUND. RESPONDING TIME TO BREAKDOWN CALLS IS WITHIN 30 MINUTES AFTERRECEIPT OF NOTIFICATION AS PER BELOW TWO SLA CONDITIONS.DEWA-CONFIDENTIAL1.#THE CONTRACTOR WHO AGREES & SI GNED THIS AMC MUST PROVIDE COMPETENTSUPERVISOR TO SUPERVISE ALL MAINTENANCE ACTIVITIES RELATED TO THEEQUIPMENT UNDER THIS CONTRACT. FAILING TO PROVIDE A COMPETENT SUPERVISORTO SUPERVISE ANY MAINTENANCE ACTIVITIES AS MENTIONED IN THIS PARAGRAPHWILL SUBJECT THE WORK TO BE UNDER EVALUATION BY DEWA ENGINEERS TO BEAPPROVED OR REJECTED. (PENALTY WILL BE APPLIED FOR NOT PROVIDINGSUPERVISOR TO SUPERVI SE THE MAINTENANCE ACTIVITY.)2.#DEWA HAS THE RIGHT TO REQUEST A COMPREHENSIVE REPORT FOR ANYACTIVITY CARRIED OUT BY THE CONTRACTOR T O THE EQUIPMENT FALLING UNDERTHIS CONTRACT. THE REPORT MUST BE PRESENTED & SUBMITTED WITH SUFFICIENTINFORMATION, PICTURES, AND VIDEO S OF THE WORK PROCESS AND PROCEDURESCARRIED OUT.3.#ALL MAINTENANCE ACTIVITIES SHALL BE PERFORMED IN THE PRESENCE/SUPERVISION OF A COMPETENT SUPERVISOR.4.#ALL PPM ACTIVITIES CARRIED OUT BY THE CONTRACTOR WHO AGREES & SIGNSTHIS AMC MUST BE CARRIED OUT AS PER THE APP ROVED DEWA CHECK LIST GIVENBY THE APPOINTED DEWA SUPERVISOR.5.#THE CONTRACTOR WHO AGREES & SIGNS THIS AMC MUST INCLUDE & SUBMITTHEIR OWN WORK CHECK LIST FOR EVALUATION & VERIFICATION BY DEWA ONQUARTERLY BASIS.6.#PPM REPORTS WITH THEIR OWN CHECK LIST AND DEWA CHECK LIST AS WELL ONA QUARTERLY BASIS FOR OUR VERIFICATION.7.#THE CONTRACTOR WHO AGREES & SIGNS THIS CONTRACT IS REQUIRED TOCONDUCT A SI TE VISIT EVERY MONTH TO CHECK THE CHILLERS# CONDITION,CHILLERS OPERATION & TO CONDUCT A PERFORMANCE EVALUATION FOR THECHILLERS AT TH E SITE. Qty: 4 Comprehensive Annual Maintenance of Air-Cooled Chillers at Al Hudaibah CHC Contact : Mohideen / 553810513 Site Visit Date <(>&<)> Time: 25/06/2026 Payment Terms: Every three months (Quarterly basis) STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412601215)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
10dd161f-d810-461d-acea-4a2ee675390b.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.