GTR 116096004
Quotation Are Invited For Ccst6 Bearing 1 Pedestal Oil Deflector Seal Ring Profile Replacement Work (Refurbishment)
ICB — International Competitive Bid
Closed
Asia
Tender Information
GTR Reference
116096004
Tendering Authority
Subscribe to view
Tender No
2412601195
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Ccst6 Bearing 1 Pedestal Oil Deflector Seal Ring Profile Replacement Work (Refurbishment)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
27-07-2026
Closed
Work Detail
Quotation are invited for CCST6 Bearing 1 Pedestal Oil Deflector Seal Ring Profile Replacement Work (Refurbishment) Ccst6 Bearing 1 Pedestal Oil 1032602602 1 ITEM-00001 CCST6 BEARING NO.1 PEDESTAL OIL DEFLECTOR SEAL RING PROFILE REPLACEMENT1. OBJECTIVEREPLACEMENT AND MACHINING OF SEAL RING PROFILE FO R CCST6 BEARING NO.1PEDESTAL OIL DEFLECTOR ASSEMBLY2. SCOPE DESCRIPTIONTHE CONTRACTOR SHALL CARRY OUT REFURBISHMENT AND REPLACEMENT OF THE OILDEFLECTOR SEAL RING INCLUDING COLLECTION, MACHINING, ASSEMBLYPREPARATION, AND DELIVERY.3. DETAILED SCOPE OF WORK3.1 COLLEC TION & TRANSPORTATIONVENDOR SHALL COLLECT THE COMPLETE OIL DEFLECTOR ASSEMBLY ALONG WITH THENEW SEAL RING PROFILE FROM E-STATION, JE BEL ALI POWER STATION (DEWA)PROPER HANDLING, PACKING, AND TRANSPORTATION SHALL BE ENSURED TO PREVENTANY DAMAGE3.2 DISMANTLING & CLEA NINGREMOVAL OF THE EXISTING (OLD) SEAL RING FROM THE OIL DEFLECTOR HOUSINGTHOROUGH CLEANING OF THE HOUSING TO REMOVE OIL 2 JOB RESIDUE, DE POSITS, ANDCONTAMINANTSINSPECTION OF HOUSING CONDITION PRIOR TO INSTALLATION OF NEW SEAL RING3.3 SEAL RING INSTALLATION & MACHININGI NSERTION OF THE NEW SEAL RING PROFILE INTO THE DEFLECTOR HOUSINGMACHINING OF THE SEAL RING INTERNAL DIAMETER (ID) AS PER REQUIREDSPE CIFICATIONSINDICATIVE ID: 315.01 MM (FINAL DIMENSIONS AND TOLERANCE LIMITS WILL BECONFIRMED DURING MACHINING ACTIVITY)ENSURE PROPER CONCENTRICITY, SURFACE FINISH, AND CLEARANCE AS PERREQUIREMENTS3.4 INSPECTION & QUALITY CONTROLDIMENSIONAL INSPECTION BEFORE AND AFT ER MACHININGVERIFICATION OF TOLERANCES, ROUNDNESS, AND ALIGNMENTSUBMISSION OF INSPECTION RESULTS FOR APPROVAL IF REQUIRED BEFORE FIN ALCOMPLETION3.5 SURFACE PROTECTIONPAINTING OF EXTERNAL SURFACES OF THE DEFLECTOR ASSEMBLY AS PER STANDARDPRACTICEENSURE PROPER CORRO SION PROTECTION DURING HANDLING AND STORAGE3.6 PACKAGING & DELIVERYPROPER PACKING AND PRESERVATION OF THE COMPLETED ASSEMBLYDELIVERY OF THE REFURBISHED ASSEMBLY TO E-STATION, JEBEL ALI POWERSTATIONENSURE PROTECTION AGAINST DUST, MOISTURE, AND MECHANICAL DAMAGE DUR INGTRANSPORT4. DOCUMENTATIONVENDOR SHALL SUBMIT A COMPLETE REPORT INCLUDING:METHOD STATEMENT COVERING ALL ACTIVITIESDIMENSIONAL REPO RTS BEFORE AND AFTER MACHININGDETAILS OF MACHINING PERFORMEDINSPECTION AND QUALITY CONTROL RECORDS5. WORK SEQUENCE CONSTRAINTCOMPONE NTS/ASSEMBLIES WILL NOT BE HANDED OVER SIMULTANEOUSLY; WORK SHALLBE EXECUTED SEQUENTIALLY BASED ON AVAILABILITY6. STANDARDS & COMPLI ANCEALL WORK SHALL BE CARRIED OUT IN ACCORDANCE WITH APPLICABLE MAINTENANCESTANDARDS AND GOOD ENGINEERING PRACTICES7. CONTRACTOR REQ UIREMENTSVENDOR SHALL HAVE RELEVANT EXPERIENCE IN MACHINING AND REFURBISHMENT OFROTATING EQUIPMENT COMPONENTSUSE CALIBRATED MEASURIN G INSTRUMENTSENSURE QUALIFIED PERSONNEL PERFORM THE WORK8. ACCEPTANCE CRITERIAACCEPTANCE WILL BE BASED ON:COMPLIANCE WITH FINAL APPR OVED DIMENSIONS AND TOLERANCESSATISFACTORY MACHINING FINISH AND ALIGNMENTSUBMISSION OF COMPLETE DOCUMENTATION9. WARRANTYTHE CONTRACT OR SHALL PROVIDE A WARRANTY FOR A MINIMUM PERIOD OF 6 MONTHSFROM THE DATE OF INSTALLATION OR 18 MONTHS FROM THE DATE OF DELIVERY,WHI CHEVER OCCURS FIRST.THE WARRANTY SHALL COVER THE FOLLOWING: CCST6 Bearing 1 Pedestal Oil deflector seal ring profile replacement work (refurbishment) Contact [email protected] STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412601195)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2aa97e73-b80a-4d13-9e82-2249c73f7fb5.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.