GTR 115989103
Tenders Are Invited For Construction Work - Execution Of Construction Works Including Renovation Of The Plinth And External Stairs, Replacement Of Joinery And Waterproofing Of The Foundations Of The Building At Ul. Kościuszki 97 In Suwałki.
ICB — International Competitive Bid
Closes Aug 20, 2026
central europe
Tender Information
GTR Reference
115989103
Tendering Authority
Subscribe to view
Tender No
504944-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work - Execution Of Construction Works Including Renovation Of The Plinth And External Stairs, Replacement Of Joinery And Waterproofing Of The Foundations Of The Building At Ul. Kościuszki 97 In Suwałki.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
20-08-2026
Work Detail
Construction Work - Execution Of Construction Works Including Renovation Of The Plinth And External Stairs, Replacement Of Joinery And Waterproofing Of The Foundations Of The Building At Ul. Kościuszki 97 In Suwałki.. 1. The Subject Of The Order Is The Execution Of Construction Works, Including The Renovation Of The Plinth And External Stairs, The Replacement Of Windows And Doors, And The Implementation Of Waterproofing Of Foundations Using The Injection Method In The Building At Ul. Tadeusza Kościuszki 97 In Suwałki, Owned By The Suwałki Commune. 2. The Detailed Scope Of The Contractors Responsibilities Is Specified In The Draft Contract Constituting Annex No. 7 To The Swz. 3. The Detailed Subject Of The Order Was Described In The Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works, And Bills Of Quantities, Constituting Annex No. 2 To Swz 4. The Ordering Party Informs That The Design Documentation And The Technical Specification For The Execution And Acceptance Of Construction Works Cover A Wider Scope Of Works Than The Subject Of This Order, Including A Comprehensive Renovation Of The Buildings Façade Along With The Replacement Of Windows And Doors. The Subject Of This Order Is Only The Scope Of Works Indicated In Section 1 And Included In The Bill Of Quantities And Other Documents Describing The Subject Of The Contract In The Scope Covered By This Procedure. To The Extent That The Design Documentation Includes Works That Do Not Fall Within The Scope Of This Order, They Are Not Subject To Valuation Or Implementation By The Contractor. 5. The Bill Of Quantities Is An Auxiliary And Informative Document When Preparing An Offer. The Scope Of Works Covered By The Order Was Specified In Section 1 And Detailed In The Design Documentation And Technical Specification For The Execution And Acceptance Of Construction Works Only In The Scope Of Works Covered By The Bill Of Quantities. 6. The Ordering Party Informs That As Of The Date Of Initiation Of The Procedure, It Is In The Process Of Obtaining A Building Permit Decision. 7. All Works Should Be Carried Out In Accordance With The Design Documentation And Applicable Technical Conditions And Regulations. 8. The Required Quality Guarantee And Warranty Period, Counted From The Date Of Signing The Final Work Acceptance Protocol, Is A Minimum Of 60 Months And A Maximum Of 72 Months. 9. Pursuant To Art. 101 Section 4 Of The Act, In The Place Where The Subject Of The Contract Is Described Using Standards, Technical Assessments, Technical Specifications And Technical Reference Systems, The Ordering Party Allows Solutions Equivalent To Those Described. Furthermore, All Such References Should Be Deemed To Be Accompanied By Words Or Equivalent Words. Indication Of The Equivalence Of The Offered Solution In Accordance With Art. 101 Section 5 Of The Act And On The Principles Specified Therein Rests With The Contractor. In The Case Of Description Using Standards, Equivalent Solutions Are Those That Ensure Compliance With The Minimum Requirements Specified In The Standard At A Level Not Worse Than That Described In The Relevant Standards. In The Case Of Standards Referred To In The Swz (Unless Specified In Detail), Current Standards Are Understood. In Other Cases (Description Of The Subject Of The Contract By Means Of Technical Assessments, Technical Specifications And Technical Reference Systems), Such A Product, Mat
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
57e2698d-c636-495e-8455-d090211fee0d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.