GTR 115988880
Tenders Are Invited For Painting Work – Zop Painting Work Bst. 3-5
ICB — International Competitive Bid
Closes Aug 21, 2026
Western Europe
Tender Information
GTR Reference
115988880
Tendering Authority
Subscribe to view
Tender No
506385-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Painting Work – Zop Painting Work Bst. 3-5
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
21-08-2026
Work Detail
Painting Work – Zop Painting Work Bst. 3-5. As Part Of Restructuring Measures, The Pius Hospital Oldenburg Is Planning To Restructure The Operating Room Replacement F Wing (3Rd Ta). For The 3Rd-5Th During The Construction Phase, Painting Work, Interior Wall Panels And Etics Work Including Plastering And Painting Must Be Carried Out. Essentially, This Involves The Following Services: 1. Painting Of Wall And Ceiling Surfaces With Friezes, 2. Metal Painting For Door Leaves And Frames, 3. Delivery, Installation Of Wall Protection Panels Made Of Hard Polyester For The Interior With The Production Of Cutouts And Elastic Sealing Of Joints 5. Etics Work: - Addition/Restoration Of The Existing Etics Of The Outer Facade In The Connection Area Of New Extensions - Addition To The Existing Etics The Outer Facade In The Area Of Bricked Up Window Openings. - Production Of Etics On The New Outer Wall Surfaces Of The Extensions With Plastering Work - Plastering Of Existing Clinker Brick Surfaces Of The Outer Facade - Painting Of The Facade Surfaces According To The Current Status, The Services Are To Be Carried Out From Mid-October 2026: Construction Stage 3 Painting Work Etics - Etics Work 30 Working Days Construction Stage 3 Painting Work - Preliminary Measure Painting Technical Rooms 5 Working Days There Is A Work Break Between The Preliminary Measure And Ceilings And Wall Surfaces Of 8 Calendar Weeks. Painting Ceiling Surfaces 25 Working Days Painting Wall Surfaces Including Wall Protection 25 Working Days The Execution Of The Ceiling And Wall Surfaces Overlaps By 10 Working Days. Construction Stage 4 Painting Work On Ceiling Surfaces 10 Working Days Painting Work On Wall Surfaces Incl. Wall Protection 10 Working Days Construction Stage 3 Approx.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
76877ac7-69ff-4831-a4c7-0af1955f66f9.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.