GTR 115939140

Expression of Interest For Carrying Out Detailed Technical Studies And Environmental And Social Studies For The Construction Of A Hydroelectric Power Plant On The Lueta River In The Territory Of Luiza, Kasai Central Province

ICB — International Competitive Bid Closes Aug 14, 2026 Africa
Tender Information
GTR Reference
115939140
Tendering Authority
Subscribe to view
Tender No
034/MITP/CI/BAD/2026
Financer Name
African Development Bank (AfDB)
Work Title
Expression of Interest For Carrying Out Detailed Technical Studies And Environmental And Social Studies For The Construction Of A Hydroelectric Power Plant On The Lueta River In The Territory Of Luiza, Kasai Central Province
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Africa
Political Region
Common Market for Eastern and Southern Africa, COMESA,African Union
Last Date of Bid Submission
14-08-2026
Work Detail
Expression of Interest for Carrying out Detailed Technical Studies and Environmental and Social Studies for the Construction of a Hydroelectric Power Plant on the Lueta River in the Territory of Luiza, Kasai Central Province The services to be provided under this contract concern the carrying out of detailed technical studies and environmental and social studies for the construction of a hydroelectric power plant on the LUETA River in the territory of LUIZA, Kasai Central Province. Specifically, the services to be provided under this contract are as follows: For the preliminary design study: Hydrological and hydrometric studies; Topographical and cartographic studies; Geological and geotechnical studies; Studies of hydraulic structures, civil engineering works and power plant equipment; Preparation of plans and cost estimates for housing and technical buildings; Studies to define the works for improving and strengthening access roads to the sites; Studies to define the route of the transmission and distribution line, step-up and step-down substations; Estimation of lots, estimation of quantities and costs, and work planning; Institutional and legal studies, financial, socio-economic, economic, commercial and tariff analysis; Risk studies; Environmental and social impact studies, Stakeholder Engagement Plan (SEP); Conclusions of the feasibility study. For the detailed design study: Detailed engineering of the Lueta hydroelectric power plant (hydraulic structures, civil engineering works and equipment); Detailed engineering of housing and technical buildings; Detailed engineering of access roads to the sites; Detailed engineering of the transmission line and substations, step-up substation at Lueta and step-down substation at Luiza; Environmental and social component of the Project; Estimation of project quantities and costs and work planning; Institutional and legal studies, financial, socio-economic, economic, commercial and tariff analysis, risk study; Preparation of final versions of the detailed design study reports; Preparation of study synthesis reports; Preparation of bidding documents and various mission reports. [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.] Tender Link : https://www.afdb.org/en/projects-and-operations/procurement
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
21303d69-8d70-42b1-97ad-14e024ff5157.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders