GTR 115888972

Tenders Are Invited For Construction Work – Installation Of A Solar System

ICB — International Competitive Bid Closes Aug 28, 2026 central europe
Tender Information
GTR Reference
115888972
Tendering Authority
Subscribe to view
Tender No
499021-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work – Installation Of A Solar System
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
28-08-2026
Work Detail
Construction Work – Installation Of A Solar System. In The Area Of ​​The Spa (3400 Mezőkövesd-Zsóry, Napfürdő U.), A Small Power Plant System Consisting Of Solar Cells, Which Does Not Require A Permit, Is Being Built, Based On The Number Of Modules And Output According To The Budget Announcement. The Current Produced By The Inverters Is Connected To The Connection Points Of The 0.4 Kv Main Distribution Board. The System Must Be Designed With Reverse Watt Protection, The Limitation Of The Network Feed Back Is Solved Through Reverse Watt Protection Regulation. Measurement Points: Napfürdő U. 2Nd Measurement Point Pod: Hu000220f11-S00000000000005010843 Existing Available Power: 500 Kw Connection Value: 3X800 A Solar Connection: 107.8 Kw Olajfa U. 1St Measurement Point Pod: Hu000220f11-S00000000000016002090 Existing Available Power: 100 Kw Connection Value: 3X160 A Solar Connection: 383.7 Kw Electrical Characteristics Of The Connection: Operating Voltage: 3F+N, 400 V, 50 Hz The Solar Inverters Are Supplied With It Is Made From High-Current Distribution Cabinets. Inverters: Total Power Of 3-Phase Inverters: 499.5 Kw, Broken Down Below: 7 Three-Phase Inverters With A Nominal Ac Power Of At Least 25 Kw Each 6 Three-Phase Inverters With A Nominal Ac Power Of At Least 20 Kw Each 2 Three-Phase Inverters With A Nominal Ac Power Of At Least 17 Kw Each 3 Three-Phase Inverters With A Nominal Ac Power Of At Least 15 Kw Each 1 Three-Phase Inverter With A Nominal Ac Power Of At Least 1 Three-Phase Inverter With A Nominal Ac Power Of 12.5 Kw 1 Pc. Three-Phase Inverter With A Nominal Ac Power Of At Least 10 Kw 1 Pc. • Parking Area: 320.32 Kw • Swimming Pool: 63.36 Kw • Bath: 81.08 Kw • Farm Buildings, Childrens Resort: 117.88 Kw A Total Of 1,131 Solar Modules With A Nominal Output Of At Least 440 Wp Each And 115 Solar Modules With A Nominal Output Of At Least 720 Wp Each Are Placed In The System. The Solar Modules, Inverters And Related Electrical Equipment To Be Installed Must Comply With The Technical, Safety And Performance Requirements Specified In The Design Documentation, The Technical Description, The Relevant Standards And The Regulations Of The Network Licensee. Reference To A Specific Make Or Type Is Omitted; Offering A Product That Is Technically Equivalent To The Specifications Is Accepted. Property Investment Is An Activity Subject To A Building Permit. 321/2015. (X. 30.) In View Of The Provisions Of Section 46 (3) Of The Government Decree (Hereinafter Cr,), The Contracting Authority Draws Attention To The Fact That If A Clear And Comprehensible Definition Of The Subject Of The Public Procurement Made It Necessary To Refer To A Thing Of A Specific Make, Origin, Type, Process, Activity, Person, Trademark Or Patent, The Designation Cs
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6ef8a8af-20de-4691-8208-b43bc04e81d5.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders