GTR 115888275
Tenders Are Invited For Technical Planning Services – General Planning For Mainova Ag Water Treatment Plants
ICB — International Competitive Bid
Closes Aug 17, 2026
Western Europe
Tender Information
GTR Reference
115888275
Tendering Authority
Subscribe to view
Tender No
498643-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Technical Planning Services – General Planning For Mainova Ag Water Treatment Plants
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
17-08-2026
Work Detail
Technical Planning Services – General Planning For Mainova Ag Water Treatment Plants. The West Combined Heat And Power Plant (Hkw West) Is The Largest Generation Site Of Mainova Aktiengesellschaft And Represents The Central Generation Plant Of The City Center District Heating Network. At The Hkw West Site, Several Plants For Generating Electricity, Steam And District Heating Are Operated. The Subject Of The Contractual Services Is The Hkr Plant At The Hkw West Location. The System Processes Returning District Heating Condensate As Well As Machine Condensate And Has Been In Operation Since 1967. Since Then, The System Has Been Regularly Maintained And Repaired. The Project Pursues The Goal Of Modernizing The Entire System, The Conceptual Development Of Which Is Based On The Results Of The Feasibility Study From 2021 And The Completed Preliminary Planning From 2022. Also In This Project Is The Construction Of A New Full Desalination Plant To Replace The Existing Deionate Production. Mainova Ag Operates A 2-Line Full Desalination Plant At Hkw-West In The Existing Building 0402F (“Ve3 Plant”) With A Processing Capacity Of 80 M³/H. The Demineralised Water Is Required To Replenish The District Heating System, The Factory Water Circuit And The Water-Steam Cycle. The Ve3 System Was Built In 1980 By Mannesmann Anlagenbau And Is Used To Prepare Drinking Water Into Boiler Feed Water In Accordance With Vgb-M 407 G. For The Hkr, Due To The Existing Preliminary Planning, It Should Start In Phase 3 According To Hoai And For The Ve3, Due To The Lack Of Preliminary Planning, It Must Start In Phase 2 Based On The Hoai. Phase 1 Lph 2 Preliminary Planning Lph 3 Draft Planning Lph 4 Approval Planning Lph 5 Execution Planning Lph 6 Preparation Of The Award Lph 7 Participation In The Award (Only Obtaining Offers And Comparison) The First Phase Of The Project Ends With The Evaluation Of The Suppliers Offers. Based On The Completed Implementation Planning And The Suppliers Offers, The Project Is Checked Internally For Continuation And, If The Result Is Positive, The Release Of Funds Is Sought. In The Further Phase, The Client Also Intends To Commission The Contractor For The Following Further Service Phases. Phase 2 Lph 7 Participation In The Award Of Contracts (Award Negotiations Through To Contract Conclusion) Lph 8 Object Monitoring – Monitoring Of Detailed Planning, Production, Construction Supervision And Documentation
Key Value
Tender Value
800,000 - EUR
Tender Documents
Global Tender Document
3b17dd9b-0607-4aa9-8553-fab25e6ecb47.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.