GTR 115766876
Tenders Are Invited For Partial Renovation Of Bituminous Surfaces With Asphalt Emulsion And Hard Grit Of District Roads - 115 Mg.
ICB — International Competitive Bid
Closes Aug 03, 2026
central europe
Tender Information
GTR Reference
115766876
Tendering Authority
Subscribe to view
Tender No
ZP.272.26.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Partial Renovation Of Bituminous Surfaces With Asphalt Emulsion And Hard Grit Of District Roads - 115 Mg.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
03-08-2026
Work Detail
1. Partial Renovations Of Bituminous Surfaces With Asphalt Emulsion And Hard Grit Will Be Performed Using A Patcher Renovation Machine. In 2026, 100 Mg Of Asphalt Emulsion And Hard Grit Will Be Allocated For District Roads.2. Partial Renovations Of Bituminous Surfaces Will Be Made With Hot Asphalt Mass. 15 Mg Of Hot Asphalt Mass Is Allocated For This Purpose.3. The Exact Scope Of Works Is Described In The Bill Of Quantities And Technical Specifications For The Execution And Acceptance Of Works, Which Constitute An Annex To The Swz. 4. Permissible Significant Changes To The Contract, Interfering With, Among Others: The Description And Scope Of The Subject Of The Order Are Included In The Draft Contract, Which Is An Annex To The Swz In Question. 5. In All Cases Where, Due To The Specificity Of The Subject Of The Order, The Origin Of Materials And Devices Is Indicated, The Use Of Equivalent Materials And Devices Is Allowed, I.E. All Materials And Devices Mentioned By Name In The Documentation Provided By The Ordering Party Serve To Determine The Standard And May Be Replaced By Other Materials With No Worse Technical, Functional, Qualitative, Functional And Aesthetic Parameters, Taking Into Account Proper Cooperation With Other Materials And Devices. 6. The Indicated Quantities Of Materials Constitute The Planned Order Quantity And May Be Reduced According To The Needs Of The Ordering Party During The Duration Of The Contract. 7. The Contractor Will Keep A Register Of The Execution Of The Subject Of The Order On Each Vehicle And On Each Road Throughout The Duration Of The Order. The Bidder Will Control The Consumption Of The Planned Amounts Of Materials. After Completing The Service, The Bidder Will Provide The Ordering Party With Documents Confirming The Material Incorporated Into District Roads And A List Of Roads With The Amount Of Material Incorporated For Each Road. 8. The Acceptance Of Works That Disappear And Are To Be Covered Consists In The Final Assessment Of The Quantity And Quality Of The Works Performed, Which Will Be Covered In The Further Implementation Process. The Acceptance Of Works That Disappear And Are To Be Covered Will Be Carried Out During The Implementation Of The Works, Enabling Any Corrections And Fixes To Be Made Without Impeding The Overall Progress Of The Works. 9. Acceptance Is Carried Out By An Authorized Employee Of The Ordering Party.10. Each Time The Mixture Is Added By The Renovator, The Contractor Enters It In The Work Log, With Simultaneous Notification And Confirmation By An Authorized Employee. 11. The Acceptance Will Be Carried Out Immediately, But No Later Than Within 14 Days From The Date Of Notification Of Their Completion With An Entry In The Work Log, Specifying The Amount Of Built-In Mass, The Length Of The Road, The Road Number, The Name Of The Road - The Town Where The Partial Renovation Of The Mass Was Carried Out.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
018a6207-9dda-4fef-8f83-dd0212839bbe.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.