GTR 115634998
Tenders Are Invited For Engineering Services – Planning Services Hoai Lp 1-9, Of Which 5-9 Are Optional
ICB — International Competitive Bid
Closes Aug 18, 2026
Western Europe
Tender Information
GTR Reference
115634998
Tendering Authority
Subscribe to view
Tender No
484592-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Services – Planning Services Hoai Lp 1-9, Of Which 5-9 Are Optional
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
18-08-2026
Work Detail
Engineering Services – Planning Services Hoai Lp 1-9, Of Which 5-9 Are Optional. The Subject Of The Order Is Planning Services For The New Construction Of A Sludge Dumping Area For The Hamm City Drainage East Of The Kla Hamm West. The Sludge Dumping Site Must Be Redesigned As A Facility For Receiving, Temporarily Storing And Loading Sludge And Other Organic And Mineral Mixtures. Three Modular And Variably Usable Storage Boxes Are Planned, Each With A Depth Of Approx. 15 M, A Width Of Approx. 12 M And A Height Of Approx. 10 M With A Maximum Interim Storage Period Of Up To Four Weeks. The Support And Roof Structure Must Be Designed As A Steel Structure (Galvanized Steel, E.G. Trapezoidal Sheet Metal Or Sandwich Roof) And Designed To Accommodate A Photovoltaic System; A Roof Overhang Must Be Provided To Minimize The Entry Of Rainwater Into The Drainage Systems. The Photovoltaic System Must Be Designed With An Annual Yield Of Approximately 110,000 Kwh, Taking Into Account The Limit Of 100 Kwp, And Combined With A Battery Storage System With A Capacity Of Approximately 50 Kwh. The Base Plate Must Be Waterproof And Corrosion-Resistant And Provided With A Differentiated Gradient (E.G. 3% / 2% / 1%) In The Direction Of The Seepage Water Channel. Suitable Separation Systems (E.G. Concrete Blocks) Must Be Provided To Separate The Storage Areas. Furthermore, Drainage Facilities With Seepage Water Channels And Sand Traps As Well As A System For Controlled Clear Water Release Via A Fitting Shaft Must Be Planned. The Measure Also Includes A Washing Area For Cleaning The Vehicles Used, Including Treating The Resulting Wastewater. In Addition, A Reinforced Concrete Coach House With A Separate Operating Area Must Be Provided, Which Includes Parking Spaces For Two Company Vehicles As Well As Technical, Storage And Social Areas. This Includes, In Particular, Switchgear, Energy Storage, Emsr Technology, Storage Areas And Sanitary Facilities. The Subject Of The Order Is Planning Services For The New Construction Of A Sludge Dumping Area For The Hamm Urban Drainage East Of The Kla Hamm West For The Service Profiles Of Engineering Structures (Service Phases 1 - 9, Hoai 2021), Structural Planning (Service Phases 1 - 6, Hoai 2021), Technical Equipment (Service Phases 1 - 9, Hoai 2021).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e3eff9da-0f7e-44f1-bbd8-c5258fc14aaf.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.