GTR 115579313
Tenders Are Invited For Supervision Of Building Work - Carrying Out Investor Supervision Over The Construction Of Two Fire Detection Rooms In The Design And Build System And The Assembly Of A Set Of Specialized Ground Observation Devices
ICB — International Competitive Bid
Closes Aug 10, 2026
central europe
Tender Information
GTR Reference
115579313
Tendering Authority
Subscribe to view
Tender No
480491-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Supervision Of Building Work - Carrying Out Investor Supervision Over The Construction Of Two Fire Detection Rooms In The Design And Build System And The Assembly Of A Set Of Specialized Ground Observation Devices
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
10-08-2026
Work Detail
Supervision Of Building Work - Carrying Out Investor Supervision Over The Construction Of Two Fire Detection Rooms In The Design And Build System And The Assembly Of A Set Of Specialized Ground Observation Devices. A Detailed Description Of The Subject Of The Order Is Included In The Swz And Annexes To The Swz. The Subject Of The Order Are Services Consisting In Providing Investor Supervision Over Investments Including The Implementation Of: A. Construction Of Two Fire Detection Stations In The Pniewy Forest District In The Design And Build System - To The Full Extent, B. Delivery, Assembly And Commissioning Of A Set Of Specialized Devices For Terrestrial Observation Of Forest Areas And Locating Forest Fires Along With Equipment For An Alarm And Dispatch Point - To A Limited Extent Regarding The Implementation Of The Necessary Connections (Including Verification Of The Correctness Of The Selection Technology) And Installation Of Video Elements. The Order Includes Supervision On Behalf Of The Ordering Party Over The Implementation Of The Construction Investment (Performing The Duties Of A Supervision Inspector In Accordance With The Act Of July 7, 1994, Construction Law, Journal Of Laws Of 2025, Item 418). 3.2. The Ordering Party Does Not Provide For A Site Visit. 3.3. The Ordering Party Does Not Reserve The Obligation For The Contractor To Personally Perform Key Tasks Related To The Subject Of The Order. The Contractor May Entrust The Execution Of Part Of The Order To Subcontractors. If The Contractor Intends To Implement The Subject Of The Order With The Participation Of Subcontractors, The Contractor Is Obliged To Indicate In His Offer The Parts Of The Order (Material Scopes) The Performance Of Which He Intends To Entrust To Subcontractors, And To Provide The Names Of Any Subcontractors, If They Are Already Known. If Subcontracting Is Not Indicated In The Offer, The Contractor Will Be Able To Introduce A Subcontractor Only On The Terms Specified In The Contract. 3.4. Common Procurement Vocabulary Cpv: 71247000-1 Supervision Of Construction Works 3.5. Contractors Obligations: Before Commencing The Implementation Of Services, The Contractors Obligations Include Familiarizing Themselves With The Functional And Utility Program And Design Documentation, Including Preparing A Co-Report Of Design Documentation And Familiarizing Themselves With The Investment Area, Its Infrastructure And Existing Devices. The Contractor Is Obliged To Represent The Ordering Party At The Construction Site And Exercise Investor Supervision Over The Implementation Of Construction Works In Terms Of Technical, Qualitative, Organizational, Formal And Timely Performance, In Accordance With The Design Documentation, Conditions Of The Construction Permit, Applicable Legal Regulations, Standards, Industry Guidelines, Principles Of Technical Knowledge, The Contract Concluded With The Construction Contractor And The Material And Financial Schedule. As Part Of The Provision Of Services, The Contractor Is Obliged In Particular To: A) Participate In The Handover Of The Construction Site To The Construction Works Contractor; B) Supervising The Proper Course Of Construction Works, While The Frequency Of Stays On The Construction Site, The Length Of Stays And The Composition Of The Staff Should Be Adapted To The Level Of Advancement Of The Works And Ensure The Effectiveness Of Supervision, But At Least Once A Week During The Implementation Of The Works; C) Cooperation With Authors Supervision And Other Entities Performing Inspection Activities Or On
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7cd8d05b-666a-418f-b8b9-7bd624472bbc.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.