GTR 115542628

Tenders Are Invited For Implementation Of Smr In Connection With The Implementation Of Objects Under Procedure Bg16ffpr003-4.001 Support For Sustainable Energy Renovation Of Multi-Family Residential Buildings, Including Tackling Energy Poverty For Object: Implementation Of Energy Efficiency Measures In A Multi-Family Residential Building At St. Knyaz Boris I Street #98, Stara Zagora

ICB — International Competitive Bid Closes Aug 03, 2026 Eastern Europe
Tender Information
GTR Reference
115542628
Tendering Authority
Subscribe to view
Tender No
00774-2026-0104
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Implementation Of Smr In Connection With The Implementation Of Objects Under Procedure Bg16ffpr003-4.001 Support For Sustainable Energy Renovation Of Multi-Family Residential Buildings, Including Tackling Energy Poverty For Object: Implementation Of Energy Efficiency Measures In A Multi-Family Residential Building At St. Knyaz Boris I Street #98, Stara Zagora
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
03-08-2026
Work Detail
Implementation Of Smr In Connection With The Implementation Of Objects Under Procedure Bg16ffpr003-4.001 Support For Sustainable Energy Renovation Of Multi-Family Residential Buildings, Including Tackling Energy Poverty For Object: Implementation Of Energy Efficiency Measures In A Multi-Family Residential Building At St. Knyaz Boris I Street #98, Stara Zagora ​​​​​​​Category Of Construction: Fourth Category, In The Sense Of Art. 137 Of Zut And Ordinance No. 1 On The Nomenclature Of Construction Types. The Public Order Envisages The Implementation Of The Following Measures: Thermal Insulation Of The External Facade Walls With An Eps Type Thermal Insulation System, With Thermal Conductivity Coefficient Λ≤ 0.035 W/Mk And Thickness Δ=0.12 M With A Finish Coating Of Exterior Plaster. Replacement Of All Doors And Windows From Wooden, Metal, Aluminum Joinery On The Facade And Pvc Windows With New Five-Chamber Double-Glazed Pvc Joinery With One High-Energy Glass (4 Seasons) From The Outside With A Generalized Heat Transfer Coefficient Of The Assembled Element Uw≤1.40 W/M2k. Thermal Insulation Of A Pitched Cold Roof With An Air Layer >0.30M (Type 1) With Execution Sequence: Thermal Insulation On The Ceiling Of The Unheated Basement Of The Building With A Thermal Insulation System With Laminated Mineral Wool, With Thermal Conductivity Coefficient Λ≤ 0.035 W/Mk And Thickness Δ=0.08 M. Thermal Insulation Of The External Facade Walls Surrounding The Unheated Basement Of The Building With A Thermal Insulation System Type Xps, With Thermal Conductivity Coefficient Λ≤ 0.035 W/Mk And Thickness Δ=0.12 M With A Finish Coating Of Mosaic Plaster. Replacement Of Existing Old Lighting Fixtures With New Energy-Saving Lighting Fixtures, In Common Areas With Motion Sensors. Other Activities Provided For In The Project Documentation.
Key Value
Tender Value
230,056 - BGN
Tender Documents
Global Tender Document
ee03d068-6b19-4335-9ebb-f470608794b1.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders