GTR 115299284

Tenders Are Invited For Construction Work - Reconstruction With A Superstructure And Expansion Of Building No. 2 Along With A Connector, Which Houses The Cardiology Clinic And The Internal Diseases Clinic In The Design And Build System - Task No. 91837 - Stage I, Construction Of The Connector On The Terms Specified In The Swz.

ICB — International Competitive Bid Closes Jul 20, 2026 central europe
Tender Information
GTR Reference
115299284
Tendering Authority
Subscribe to view
Tender No
460734-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work - Reconstruction With A Superstructure And Expansion Of Building No. 2 Along With A Connector, Which Houses The Cardiology Clinic And The Internal Diseases Clinic In The Design And Build System - Task No. 91837 - Stage I, Construction Of The Connector On The Terms Specified In The Swz.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
20-07-2026
Work Detail
Construction Work - Reconstruction With A Superstructure And Expansion Of Building No. 2 Along With A Connector, Which Houses The Cardiology Clinic And The Internal Diseases Clinic In The Design And Build System - Task No. 91837 - Stage I, Construction Of The Connector On The Terms Specified In The Swz.. Reconstruction With A Superstructure And Expansion Of Building No. 2 Along With The Connector, Which Houses The Cardiology Clinic And The Internal Diseases Clinic In The Design And Build System - Task No. 91837 - Stage I, Construction Of The Connector On The Terms Specified In The Swz. Justification For Allowing Only 3D Modular Technology With A Steel Structure A) The Ordering Party Indicates That In The Two Public Procurement Procedures Conducted So Far, Announced From November 6, 2025, In Which The Implementation Of Investments In Traditional Technology Was Allowed While Allowing Modular Solutions, There Was No Effective Selection Of The Contractor, Which Resulted In The Need To Invalidate Them. The Above Resulted In A Significant Loss Of Time, And Further Duplication Of The Current Model Of Procedure Would Involve A High Risk Of Further Delays, Which The Ordering Party - Due To The Nature Of The Investment - Cannot Accept. B) Due To The Need To Urgently Implement The Investment Project, The Ordering Party Is Obliged To Adopt Technological Solutions That Will Guarantee The Maximum Shortening Of The Work Implementation Time And The Reduction Of Construction Risks. The Analysis Of Available Technologies Showed That Only 3D Modular Technology With A Steel Structure Ensures The Possibility Of Implementing The Investment Within The Required Deadline, While Maintaining High Quality Of Workmanship. C) Additionally, It Should Be Emphasized That The Investment Is Being Carried Out In Particularly Difficult Organizational And Technical Conditions. The Investment Site Is Located In An Area With Limited Spatial Accessibility, Making It Impossible To Organize A Classic Construction Site And Carry Out Intensive Earthworks And Assembly Works Typical Of Traditional Technology. At The Same Time, The Facility Is An Active Hospital Operating Continuously, Without The Possibility Of Temporarily Shutting Down Part Of It From Use Or Relocating Patients. Consequently, Construction Works Must Be Carried Out In A Way That Minimizes Interference With Ongoing Medical Activities, Including Without Generating Excessive Noise, Vibrations And Dust, As Well As Without Long-Term Occupation Of Usable Spaces. D) Moreover, The Facility Is Under Conservation Protection, Which Obliges The Ordering Party To Carry Out Works Under Strict Formal And Technical Conditions, Limiting The Possibility Of Interference With The Existing Building Structure And The Surroundings. E) In The Light Of The Above, 3D Modular Technology With A Steel Structure Is The Only Solution That Meets All The Requirements Of The Ordering Party, In Particular By: • Significant Shortening Of The Implementation Time Thanks To The Prefabrication Of Elements Outside The Investment Site, • Limiting Wet And Field Works, • Minimizing The Nuisance For The Functioning Hospital (Noise, Vibrations, Dust), • Reducing The Need For Construction Facilities And Storage Space, • The Possibility Of
Key Value
Tender Value
66,404,642 - PLN
Tender Documents
Global Tender Document
7f17635f-7d23-446a-9997-100202a592a0.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders