GTR 115259869

Request For Quotation Purchasing Spare Parts

ICB — International Competitive Bid Closed Central Asia
Tender Information
GTR Reference
115259869
Tendering Authority
Subscribe to view
Tender No
17276629
Financer Name
Self-Funded
Work Title
Request For Quotation Purchasing Spare Parts
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
07-07-2026 Closed
Work Detail
Set Of Pipelines For The Cooling System Bts-4 Requirements For Metal Pipes: Materials (Steel 20, 30Khgsa, Aluminum Alloys) Must Have: - Have High Fatigue Strength; - Be Resistant To Internal Corrosion; - Withstand Temperature Changes; - Be Well Welded And Machined; - Have Sufficient Rigidity Of Shape. Main Parameters Of Pipes: Diameter (Internal) 8-57Mm Wall Thickness 1-3Mm Operating Temperature Up To 135°C Pressure (Max.) 0.8 Mpa. Requirements For Flexible Pipelines (Sleeves): Rubber-Fabric Materials Must: - Be Oil And Fuel Resistant; - Maintain Elasticity At Low Temperatures (Up To −40 °C); - Withstand Elevated Temperatures Without Destruction; - Have Reinforcement (Fabric Or Metal) For Strength; - Be Resistant To Cracking And Aging. And Oils Types Of Connections: - Fittings According To Gost; - Union Nuts; - Seal; - Cone-Cone; - Copper Rings. Control And Testing. Pressure Testing: 1.25–1.5 Of The Working Pressure, Tightness Control. Contents: 1-Pipe From Pump 54.02.120Sb-A. 2-Water Drain Valve - 166.02.27Sb. 3-Pipe 54.02.107Sba. 4-Pipe From The Engine To The Coil - 155.02.115Sb-1B. 5-Pipe From The Water Pump - 02/54/45Sb-7B. 6 - Outlet Pipe - 54.02.130Sb-A. 7.-Pipe Connecting To The Tap - 155.02.12.Sb-1. 8-Heater Pipe - 166.02.26Sb. 9 - Heater Pipe - 165.02.13Sb-1A. - 3 Pieces. 10.-Heater Pipe-165.02.14Sb-2. 11- Tube (Oil + Water) From The Oil Tank To The Water Pump. 12. Tube (Oil + Water) From The Tap To The Mzn. 13- Tube From Mzn. 14- Heater Pipe. 15-Pipe From The Water Drain Valve. 16- Tube From The Engine Sump. The Warranty Period For The Operation Of The Equipment Is 12 Months From The Date Of Commissioning., Set Of Pipelines For The Cooling System Of The T-62 Tank Requirements For Metal Pipes: Materials (Steel 20, 30Khgsa, Aluminum Alloys) Must Have: - Have High Fatigue Strength; - Be Resistant To Internal Corrosion; - Withstand Temperature Changes; - Be Well Welded And Machined; - Have Sufficient Rigidity Of Shape. Main Parameters Of Pipes: Diameter (Internal) 8-57 Mm Wall Thickness 1-3Mm Operating Temperature Up To 135°C Pressure (Max.) 0.8 Mpa Requirements For Flexible Pipelines (Sleeves): Rubber-Fabric Materials Must: - Be Oil And Fuel Resistant; - Maintain Elasticity At Low Temperatures (Up To −40 °C); - Withstand Elevated Temperatures Without Destruction; - Have Reinforcement (Fabric Or Metal) For Strength; - Be Resistant To Cracking And Aging. Operating Conditions. Ambient Temperature: From -40°C To +50°C Coolant Temperature: Up To 115°C Pressure: - Cooling System: Up To 0.03–0.5 Mpa Impacts: - Vibration; - Dust, Dirt; - Possible Ingress Of Fuel And Oils Types Of Connections: - Fittings According To Gost; - Union Nuts; - Seal; - Cone-Cone; - Copper Rings. Control And Testing. Pressure Testing: 1.25–1.5 Of The Working Pressure, Tightness Control. Contents: 1. Pipe From Pump 54.02.120Sb-A. 2. Water Drain Valve - 166.02.27Sb. 3. Pipe - 54.02.107Sb-A. 4. Pipe From The Engine To The Coil - 155.02.115Sb-1B. 5.Pipe-155.02.125Sb-A. 6. Pipe From The Water Pump - 02.54.45.Sb-7B. 7. Outlet Pipe - 54.02.130Sb-A. 8. Connecting Pipe With Tap - 155.02.12Sb-1. 9. Heater Pipe - 166.02.26Sb. 10.Tube-155.02.116Sb. 11. Tube - 54.02.123Sb. 12. Heater Pipe - 165.02.13Sb-1A. 13. Heater Pipe - 165.02.14Sb-2. 14. Tube (Double Oil + Water) From The Oil Tank To The Water Pump. 15. Tube From Mzn. 16. Tube (Double Oil + Water) From The Tap To The Mzn. 17. Connecting Tube Of Engine Heads. The Warranty Period Is 12 Months From The Date Of Commissioning.
Key Value
Tender Value
15,824,592 - KZT
Tender Documents
Global Tender Document
0590159f-77bf-4d86-b19f-c037207afade.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders